Scaffolding
Scaffolding provides a temporary safe working platform for activities such as:
It is formed from individual tubes and joints or proprietary components.
There are two main types of scaffolding:
- Freestanding scaffolds, such as Independent towers,
- Independent tied scaffolds, such as independent towers tied to an adjacent structure.
NB For more types of scaffold, see Types of scaffolding.
The most common piece of structure used in scaffolding is the scaffold tube (known as a standard). The tube generally comes in two thicknesses, 3.2 mm or 4 mm. The tubes are galvanised due to their exposure to the elements and axial capacity loads are given either ‘as new’ or ‘used.’ Capacities of tubes used in tension are usually limited by the safe slip load capacity of the coupler, which is far lower than the actual tensile resistance of the tube.
Scaffolding is designed for its self-weight, i.e. the weight of the boards, tubes, guardrails, toeboards, etc. and imposed loads such as wind. The imposed load applied to the scaffolding depends on its use.
Four classes of loading are available:
- Service Class 1 - 0.75 kN/m2 – Inspection and very light duty access
- Service Class 2 - 1.50 kN/m2 – Light duty such as painting and cleaning
- Service Class 3 - 2.00 kN/m2 – General building work, brickwork, etc.
- Service Class 4 - 3.00 kN/m2 – Heavy duty such as masonry and heavy cladding
The wind load applied to scaffolding will change depending on whether sheeting or debris nets are used. The magnitude of the wind load will alter the required capacity of the ties and may affect their frequency.
When scaffolding is tied to a building it uses the permanent structure of the building to provide stability. The selection of tie positions should be tested and checked before use and the suitability of the permanent structures composition to carry the ties should be analysed.
Scaffolding is also braced laterally using façade and ledger bracing.
Workmanship and inspection is vital for the erection and dismantling of scaffolding and must be undertaken by competent personal under supervision.
For more information, see Scaffold register.
For information about removing scaffolding, see How to remove scaffolding.
The National Access and Scaffolding Confederation (NASC) has published TG20:21, which provides the definitive guidance for scaffolding constructed with tube and fittings throughout the UK. TG20 comprises four elements; the Operational Guide, the Design Guide, the User Guide and the NASC’s innovative, user-friendly and widely-adopted eGuide software.
Up until March 2021, this bundle came only in the form of three hard copy guides and a digital download, and was titled TG20:13. TG20:13 was formally withdrawn, in favour of fully adopting TG20:21, on October 12 2021. Further information can be found here.
Through TG20:21 the guides and eGuide are now available online, with the improved and expanded software and the associated and updated Operational and Design Guides accessible via the NASC ePortal.
The NASC has five membership categories; Contractor, Supplier, Design, Information and International Information.
[edit] Related articles on Designing Buildings
- Building wraps.
- CDM.
- Debris netting.
- Demolition.
- Facade retention.
- Falsework.
- Formwork.
- Gantry.
- How to remove scaffolding.
- How to use a ladder.
- Putlog holes.
- Roped access for conservation projects.
- Rubble chute.
- Scaffold register.
- Shoring.
- Temporary works.
- Ties.
- Trench support.
- Types of crane.
- Types of scaffolding.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
- Working platform.
[edit] External references
- BS5975:2008 + A1: 2001 Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework (BSI 2011).
- The National Access And Scaffolding Confederation (NASC).
- Scaffolding Safety Tips
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.