Net internal area NIA
[edit] How is the area of a building measured?
The area of a building can be measured in a number of different ways:
- Gross external area (GEA).
- Gross internal area (GIA).
- Net internal area (NIA).
- Total useful floor area (TUFA).
- Usable floor area.
It is very important when describing the area of a building to be clear about which measure is being used, for example in property sales, planning applications, building regulations applications, lease negotiations, rating valuations, and so on.
[edit] What is the net internal area of a building?
The net internal area (NIA) of a building is the usable area measured to the internal finish of the perimeter or party walls, ignoring skirting boards, at each floor level. Net internal area includes all areas that can be used for a particular purpose. The UK government’s Valuation Office Agency (VOA) Code of measuring practice: definitions for rating purposes suggests that Net Internal Area includes:
- Kitchens.
- Any built in cupboards or units that occupy usable areas.
- Perimeter skirting boards, mouldings and trunking.
- Open circulation areas such as atria, corridors and entrance halls.
- Partition walls and other dividing elements.
Net internal area excludes:
- Internal structural walls.
- Walls (whether structural or not) enclosing excluded areas.
- Piers, columns, chimney breasts, ducts and other projections.
- Cleaner’s cupboards.
- Lifts, lift rooms, lift wells.
- Stairwells and landings.
- Stairwells, entrance halls, atria, landings and balconies used in common or for the purpose of essential access.
- Corridors and other circulation areas used in common with other occupiers or of a permanent essential nature.
- Boiler rooms, fuel stores, plant rooms and tank rooms other than those of a trade process nature.
- Car parking areas.
- Spaces occupied by cooling and heating equipment, air conditioning systems and ducting which renders the space substantially unusable.
- Areas with a headroom of less than 1.5m.
- Toilets and associated lobbies, unless additional toilets have been installed.
- Areas under the control of service or other external authorities.
NB Essential access does not include reception areas or areas capable of use and situated within entrance halls, atria and landings etc.
In relation to the term 'permanent essential nature' the code of measuring practice suggests that, 'apart from areas used in common with other occupiers, corridors excluded from NIA are those of a permanent essential nature, i.e. internal corridors between structural walls (usually found in older buildings). Fire corridors and smoke lobbies which are defined by non-structural walls - but only where they are permanent and essential to any prospective tenant of the property and do not merely serve the needs of the actual occupier. If the latter, they should be included.'
The RICS Guidance Note, A guide for Property Professionals, 6th Edition Code of measuring practice 2007, is in general agreement with the Valuation Office Agency definition, of net internal area.
[edit] Related articles on Designing Buildings
- Area.
- Case notes for rating valuation.
- Floor area ratio.
- Gross development area.
- Gross external area.
- Gross internal area.
- Gross site area.
- International Property Measurement Standards.
- Measurement.
- Measurement of existing buildings.
- Rating valuation.
- Site area.
- Size.
- Space.
- Total useful floor area.
Featured articles and news
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Can someone explain the design calculation? from architect point of view.
ie - lets say we have a plot of 25X10 meters in Hendon, London.
How can i calculate what is the allowed Net Ground Floor? and on the Net First Floor..?.
How to decide the allowed building contour based on plot contour?
I read that the building border should be 3 meter smaller than plot border on width and 10 meters on length - so in that case - 15 (length) on 7 (width) - which its net ground floor of 105 SQM. is it right?
what are the rules in terace house plot? in triangle plot?