Net internal area NIA
[edit] How is the area of a building measured?
The area of a building can be measured in a number of different ways:
- Gross external area (GEA).
- Gross internal area (GIA).
- Net internal area (NIA).
- Total useful floor area (TUFA).
- Usable floor area.
It is very important when describing the area of a building to be clear about which measure is being used, for example in property sales, planning applications, building regulations applications, lease negotiations, rating valuations, and so on.
[edit] What is the net internal area of a building?
The net internal area (NIA) of a building is the usable area measured to the internal finish of the perimeter or party walls, ignoring skirting boards, at each floor level. Net internal area includes all areas that can be used for a particular purpose. The UK government’s Valuation Office Agency (VOA) Code of measuring practice: definitions for rating purposes suggests that Net Internal Area includes:
- Kitchens.
- Any built in cupboards or units that occupy usable areas.
- Perimeter skirting boards, mouldings and trunking.
- Open circulation areas such as atria, corridors and entrance halls.
- Partition walls and other dividing elements.
Net internal area excludes:
- Internal structural walls.
- Walls (whether structural or not) enclosing excluded areas.
- Piers, columns, chimney breasts, ducts and other projections.
- Cleaner’s cupboards.
- Lifts, lift rooms, lift wells.
- Stairwells and landings.
- Stairwells, entrance halls, atria, landings and balconies used in common or for the purpose of essential access.
- Corridors and other circulation areas used in common with other occupiers or of a permanent essential nature.
- Boiler rooms, fuel stores, plant rooms and tank rooms other than those of a trade process nature.
- Car parking areas.
- Spaces occupied by cooling and heating equipment, air conditioning systems and ducting which renders the space substantially unusable.
- Areas with a headroom of less than 1.5m.
- Toilets and associated lobbies, unless additional toilets have been installed.
- Areas under the control of service or other external authorities.
NB Essential access does not include reception areas or areas capable of use and situated within entrance halls, atria and landings etc.
In relation to the term 'permanent essential nature' the code of measuring practice suggests that, 'apart from areas used in common with other occupiers, corridors excluded from NIA are those of a permanent essential nature, i.e. internal corridors between structural walls (usually found in older buildings). Fire corridors and smoke lobbies which are defined by non-structural walls - but only where they are permanent and essential to any prospective tenant of the property and do not merely serve the needs of the actual occupier. If the latter, they should be included.'
The RICS Guidance Note, A guide for Property Professionals, 6th Edition Code of measuring practice 2007, is in general agreement with the Valuation Office Agency definition, of net internal area.
[edit] Related articles on Designing Buildings
- Area.
- Case notes for rating valuation.
- Floor area ratio.
- Gross development area.
- Gross external area.
- Gross internal area.
- Gross site area.
- International Property Measurement Standards.
- Measurement.
- Measurement of existing buildings.
- Rating valuation.
- Site area.
- Size.
- Space.
- Total useful floor area.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.


























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Can someone explain the design calculation? from architect point of view.
ie - lets say we have a plot of 25X10 meters in Hendon, London.
How can i calculate what is the allowed Net Ground Floor? and on the Net First Floor..?.
How to decide the allowed building contour based on plot contour?
I read that the building border should be 3 meter smaller than plot border on width and 10 meters on length - so in that case - 15 (length) on 7 (width) - which its net ground floor of 105 SQM. is it right?
what are the rules in terace house plot? in triangle plot?