Grenfell tower site update October 2024
Contents |
[edit] Summary of recording October 2024
[edit] The future of Grenfell Tower
The Deputy Prime Minister is responsible for decisions on the future of Grenfell Tower. No decision has yet been made. She recognises the importance of working sensitively with the Grenfell Tower Memorial Commission and the community on this issue and supports progress towards a fitting and lasting memorial.
[edit] Site maintenance
Tower site contractor, DUK, carries out regular maintenance and checks of the props (the metal supports installed in the tower), the hoardings around the site, and the lighting, security systems and scaffolding.
[edit] Local opportunities
Local opportunities including employment, training and practical support, are available from DUK.
Some of these include:
- DUK North Kensington £45,000 premises and equipment fund
- Funding adult education English classes
- Electric van for local charities’ use
- Donations to local food banks
If you would like to talk to us about social value opportunities, please get in touch using the contact details at the end of this summary.
[edit] RBKC renewable heat network
Construction of a renewable heat network at Camborne Mews began in late September 2024. Work is expected to take about six weeks. RBKC has written to the residents of Camborne Mews to explain more about this work.
Please email [email protected] for more information.
[edit] Lancaster West Estate walkways refurbishment
RBKC’s refurbishment work on the Lancaster West Estate walkways will continue until April 2025. To find out more about the refurbishment, please go to www.wearew11.org/en
[edit] Air quality monitoring
Air quality monitoring continues to be carried out regularly around the tower. You can see the latest monitoring results at: Environmental monitoring following the Grenfell Tower fire - GOV.UK (www.gov.uk)
[edit] Health and wellbeing
The local NHS service offers physical and mental health support to members of the community affected by the Grenfell Tower tragedy, including children and young people. Visit the NHS Grenfell Health and Wellbeing Service at grenfellwellbeing.com for information.
How to talk to us
We are available for conversations with you or your family and to provide further information. To speak to us about the Grenfell Tower site, please come to our informal drop-ins on:
- Tuesday 8 October, 1pm to 3pm, Kensington Leisure Centre
- Friday 11 October, 1pm to 3pm, Al Manaar Muslim Cultural Heritage Centre
You can also contact us by email at: [mailto:grenfell.wellbeingservice@nhs.net GrenfellTowerSite@communities.gov.uk]
[edit] Further information
For the latest updates, please go to www.gov.uk/grenfell-community-updates where you can also sign up to receive email notifications. The digital signs around the site also feature the latest information about the tower.
If you would like this summary translated, please email us at: [email protected]
You can watch a video of this update here.
This article is based on the gov publication 'Grenfell Tower site update October 2024' of the same date.
[edit] Related articles on Designing Buildings
- BS 8414 Fire performance of external cladding systems.
- BS 9991:2015 Fire safety in the design, management and use of residential buildings. Code of practice.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- Building a safer future: an implementation plan.
- Building a safer future: proposals for reform of the building safety regulatory system.
- Building Safety Act.
- Building safety agreement with developers.
- Building Safety Charter.
- Building Safety Fund.
- Building safety in Wales.
- Building Safety Regulator.
- Celotex insulation.
- Chief inspector of buildings.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire Safety Act.
- Government consults on second staircases in new residential buildings over 30m.
- Government response to the Building a Safer Future consultation.
- Grenfell and professional indemnity insurance.
- Grenfell fire door investigation.
- Grenfell Tower fire background and consequences.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower industry response group.
- Grenfell Tower Inquiry Phase 1 Report.
- Grenfell Phase 2 final report for construction at a glance.
- The Grenfell phase 2 final report recommendations for the construction industry.
- Grenfell Tower Inquiry.
- Hackitt review of the building regulations and fire safety, final report.
- HPL cladding.
- Independent review of the building regulations and fire safety.
- Independent review of the construction products testing regime.
- Joint Competent Authority.
- Lakanal House fire.
- Non-ACM cladding.
- Raising the bar.
- Reform of building safety standards.
- Residential Property Developer Tax.
- Ronan Point.
- Setting the bar.
- The Cube.
- The Regulatory Reform (Fire Safety) Order 2005.
- Torre Windsor office building fire.
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.