In traditional building, the term 'spandrel' refers to the roughly triangular space or surface that is found between a curved figure and a rectangular boundary. It is thought to derive from from the Old French word 'spandre', meaning to spread.
Such spandrels can be found in a number of situations:
- The space between the curve of an arch and a rectilinear moulding.
- The space bounded by adjacent arches in an arcade and the horizontal moulding above.
- The space, where arches adjoin, between their crowns and springing lines. This is called a 'spandrel wall' if it is filled in.
- The space under a flight of stairs.
More recently, the term 'spandrel panel' has been used to refer to prefabricated triangular panels used in roof construction to separate spaces under the roof, or to complete the gable end of a roof. These panels can be installed quickly by crane, and mean that roofing contractors can complete wall elements under the roof rather than having to get brick or block layers to return to site.
Carptrash at the English language Wikipedia [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0 (http://creativecommons.org/licenses/by-sa/3.0/)], from Wikimedia Commons |
The term spandrel panel may also be used to refer to cladding panels that fill the space above the head of a window on one floor and below the cill of the window on the next floor on high-rise buildings. These panels conceal the floor structure. If they are made from opaque or translucent glass, this may be referred to as spandrel glass.
Problems with spandrel panels were linked to the Lakanal House fire in 2009, and in October 2018, following the Grenfell Tower fire, the government published advice that building owners should test the combustibility of spandrel, window and infill panels if there is no documented evidence of their fire resistance and to remove them if they are considered unsafe.
It suggests that; "Spandrel panels can be provided for both aesthetic and functional purposes. Like the rest of the external wall, the panels are generally required to meet acoustic, thermal, moisture, and fire performance requirements. Such panels are not normally load bearing but are often designed to account for wind loading... The design and materials of panels varies between buildings; some are made of singular components such as cement particle board, other panels are composite products comprising outer facing materials bonded to an inner core."
The advice states; "Where the panel product type can be confirmed building owners should check the fire performance with the manufacturer by requesting test certification. Where there is no information about the panel or there is uncertainty, it will be necessary to investigate the panel composition by sample testing."
Lakanal House |
PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines a spandrel panel as an: ‘infill panel that is located between the sill of a window and the head of the window below, or that spans the floor slab area in a curtain wall system… A spandrel panel commonly spans a compartment floor boundary and, therefore, is significant in terms of the scope for the fire to bypass fire barriers between floors.’
NB The term spandrel beam refers to an exterior beam that extends from one column to another, carrying an exterior wall load.
[edit] Related articles on Designing Buildings
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.