Working with landscape maintenance contractors
[edit] Introduction
A well-designed and maintained landscape can attract people to a site and can have a positive impact on property value and personal wellbeing. With more elaborate landscaping, it is fairly common for facilities managers or other property management professionals to outsource maintenance responsibilities to a company that specialises in grounds maintenance.
[edit] Preparing a contract
As is the case with other specialist contractors, it is important to include essential information in tender documentation, such as:
- Identification of the parties involved, addresses, names, licenses, qualifications, insurance and so on.
- Services offered, including specifics that are agreed upon as well as those being excluded. Some examples include:
- Core tasks such as grass cutting, turf, hedge, tree and bed maintenance, maintenance, removal and disposal of landscaping waste and so on.
- Optional tasks such as replacement of trees, bulbs, hedges, shrubs and so on (including the design and maintenance of replacement bedding schemes, if necessary).
- Seasonal planting and cleanup schedules.
- Clarification regarding damage to property (including irrigation systems that may be used).
- Agreements regarding maximum and minimum height levels for grass, grass edging and hedges and other landscape elements.
- Requirements for maintenance and monitoring of moisture detection systems (to ensure irrigation systems do not activate when it’s unnecessary).
- Special environmental concerns (such as schools or other sensitive adjacent areas or ecosystems to be protected from pesticides, fertilisers or pest control measures).
- Notification procedures and documentation for application of any potentially harmful chemicals (such as pesticides).
- Inclusion (or exclusion) of car park maintenance, and tasks such as ice removal or other safety issues.
- Inclusion (or exclusion) of specific activities such as weed control, mulching, leaf collection and removal and so on.
- Equipment storage.
- Procedures for reporting and dealing with vandalism.
- Arrangements when safety restrictions or exclusion zones must be put in place (particularly when landscaping work requires the placement of safety barriers).
- Fees (typically for work completed), including payment plans and form of payment.
- Key dates, including start and finish dates.
- Arrangements regarding access to locked or restricted areas.
It is also helpful to have an inventory of trees, shrubs and other types of landscaping on the site. In order for the list to be suitable for the contract specifications, it should include details such as size, age, condition and maintenance requirements of each item.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.