Seeding and turfing
Seeding and turfing are two techniques for creating a grass lawn, which is a common feature in a garden. Both techniques require a considerable amount of care and attention.
Generally, turfing is considered to be the easiest and fastest-to-complete option. It requires less work in terms of ground preparation and the turf is provided in rolls that can be cut according to the shape required. However, there will have to be a suitably level and firm surface before the turf is laid. Roots will grow into the soil within two weeks and the resulting lawn can be useable within three weeks.
Other advantages of turfing include that in heavy rain it will not wash off sloped ground as seed might, it is less prone to attack by birds, there is less watering required, and turf can be laid at any time of the year. The disadvantages are that it can be expensive for large areas and it requires fast laying once it has been delivered.
Seeding a lawn is more difficult and preparing the ground is more time-consuming. Seeding involves the removal of stones down to a maximum diameter of no larger than 1 cm, whereas turfing can leave stones of up to 3-4 cm in diameter.
It can take 3-4 months to grow into a useable lawn from seed, and this can be longer depending on the weather conditions. It also requires more aftercare during the first month than turf.
The advantages of seeding are that it is less expensive and time-consuming than turfing, and it is generally the most suitable option for small areas of ground or for repairing lawns. It is also more durable and can be easily reseeded as required.
NB Short Guide, Lime Mortars in Traditional Buildings, published on 1 March 2013 by Historic Scotland, defines seeding as: ‘The nucleation of lime crystals on the surface of particles (usually of the same composition). Seeding particles can act like a catalyst, speeding up the carbonation of lime mortars.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.


















