Shop drawings (or workshop drawings) are prepared by contractors, subcontractors, suppliers, manufacturers and fabricators. They generally relate to pre-fabricated components, showing how they should be manufactured or installed. They take design intent drawings and specifications prepared by the project design team and develop them to show in detail how the component will actually be manufactured, fabricated, assembled or installed.
Shop drawings might be prepared for components such as structural steelwork, reinforcement, lifts, building services equipment, appliances, ductwork, piping, plumbing, windows, cabinets, electrical and data layouts, fire protection and so on.
They may be reviewed by the project design team prior to fabrication to verify that they comply with design drawings and specifications and to ensure that different packages of work and components are properly coordinated. This means that they need to contain relevant information to enable this to be done, which might include the provision of samples for approval. However, this does not relieve the originator of the drawings from responsibility for their correct preparation.
Shop drawings may also be used to check installation on site. Suppliers may wish to visit the site before, or during the preparation of shop drawings to verify key dimensions are accurate, particularly on refurbishment or renovation projects.
Where shop drawings vary from design drawings, these variations should be highlighted on the shop drawings and brought to the attention of the design team. This is particularly important to ensure proper co-ordination on site, as fabricators are likely only to refer to the shop drawings, and not the design drawings.
Procedures may be in place for the electronic handling of drawings for comment, review and co-ordination. Where digital drawings are required, file formats, naming and layering conventions may have to be adhered to.
Increasingly, building information modelling is used as a means of managing project information, co-ordinating the design and detecting clashes. This can be useful to suppliers in providing clear information upon which shop drawings can be based, and allowing the shop drawings themselves to be re-incorporated back into the building information model, eliminating time-consuming manual practices and minimising errors.
PAS 1192-2:2013 Specification for information management for the capital/delivery phase of construction projects using building information modelling (now replaced by BS EN ISO 19650) states that, ‘There shall be a 'change of ownership' procedure for the information and objects that specialist sub-contractors introduce to replace the original designers’ intent such that the resulting graphical models can be used for fabrication, manufacture and installation… This change of ownership should be fully understood, specialist teams do not alter the models produced by the professional designers: they build new models defining the virtual construction model (VCM).'
Some suppliers may not yet have the capability of producing BIM information, and this may prove a barrier to winning work.
Increasingly, the preparation of shop drawings is outsourced where the supplier does not have the appropriate skills, software, hardware or resources necessary, or where they may be able to obtain lower rates or faster turnaround. However, this may not properly exploit the expertise of the supplier and places responsibility for preparing important design information with an organisation that is not contractually responsible for it and may not have the detailed knowledge necessary. The supplier should carefully check any shop drawings that are outsourced in this way.
[edit] Related articles on Designing Buildings
- As-built drawings and record drawings.
- Assembly drawing.
- Building information modelling.
- Detail drawing.
- Component drawing.
- Concept drawing.
- Design drawings.
- Drawings.
- General arrangement drawing.
- Installation drawings.
- Notation and units on drawings and documents..
- Production drawing.
- Production information.
- Working drawings.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
===Further reading===