Fabrication
|
In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project, for example, a window, door, steel member, staircase and so on that is typically made off-site to the specification required for the project.
A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.
For more information see: Prefabrication.
In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.
[edit] Related articles on Designing Buildings Wiki
- Concrete frame.
- Construction problems avoided by using a modular approach.
- Crosswall construction.
- Design for Manufacture and Assembly (DfMA).
- Modular buildings.
- Offsite manufacturing.
- Off-site construction.
- Off site, on track.
- Prefabrication.
- Stainless steel.
- Steel frame.
- Structure relocation.
- The overlooked secret of off-site fabrication.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.