Fabrication
|
In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project, for example, a window, door, steel member, staircase and so on that is typically made off-site to the specification required for the project.
A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.
For more information see: Prefabrication.
In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.
[edit] Related articles on Designing Buildings Wiki
- Concrete frame.
- Construction problems avoided by using a modular approach.
- Crosswall construction.
- Design for Manufacture and Assembly (DfMA).
- Modular buildings.
- Offsite manufacturing.
- Off-site construction.
- Off site, on track.
- Prefabrication.
- Stainless steel.
- Steel frame.
- Structure relocation.
- The overlooked secret of off-site fabrication.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.