Suppliers for design and construction
In the construction industry, ‘supplier’ (or economic operator) is a very general term which refers to organisations contracted as part of the delivery of a built asset.
Traditionally, suppliers might have been considered to be organisations contracted to provide physical supplies such as goods, materials, plant, and so on, however, its use is now much broader and PAS 1192-2 (now replaced by BS EN ISO 19650) defines a supplier as any ‘…provider of services or goods either directly to the employer or to another supplier in a supply chain’. The 'supply chain' is the interconnected hierarchy of suppliers.
As construction has become more complex, and suppliers have become more specialist, so the supply chain has extended. On a straight-forward 'traditional' building project, design consultants and the main contractor, sometimes referred to as tier 1 suppliers, work for the employer, and the main contractor may have a limited chain of their own suppliers.
However, on PFI or design and build projects, there may be just one first tier, or principal supplier, with wide range of consultants, sub-consultants, and sub-contractors working for them. The situation becomes more complicated on large projects when the employer has several tier 1 suppliers, all with extended supply chains. This may cascade down to a plethora of suppliers sometimes unknown to management at the top of the chain.
One of the difficulties encountered in the construction industry is that the first and second tier of the supply chain often sign-up to fairly onerous contract conditions but as the chain develops, so the contractual liabilities decrease until suppliers at the end of the chain may not be ‘locked in’ at all.
BIS Research paper No. 145, Supply Chain Analysis into the Construction Industry, A Report for the Construction Industrial Strategy, published by the Department for Business Innovation and Skills in October 2013 assessed five projects ranging in value from £1 million to £25 million.
It defined suppliers as:
The report suggests that, ‘Tier 1 contractors are typically termed main contractors, and many tier 2 contractors are described as specialist contractors. Labour-only sub-contractors typically operate at the third tier.’
It found that it was not uncommon to have 50 to 70 tier 2 suppliers and sub-contractors and suggested that the, ‘…duplication of multiple layers of profit, overhead and risk could represent a source of non-value added cost and waste.’
In recent years, larger employers offering continuity in construction have taken an increasing interest in establishing relationships beyond direct, first tier suppliers. Framework contracts and partnering agreements have pioneered this approach, encouraging the involvement of selected suppliers at relatively early stages of projects while offering continuity of work. This has led to greater collaboration between lead designers, contractors, specialist designers and specialist suppliers.
[edit] Related articles on Designing Buildings
- Code for Construction Product Information CCPI.
- Contractor vs supplier.
- Critical service contracts.
- Critical suppliers.
- Fragmentation of the UK construction industry.
- Indirect supplies.
- Integrated supply team.
- Key suppliers.
- Main contractor.
- Manufacturer.
- Named specialist work.
- Nominated supplier.
- Novation.
- PAS 1192-2.
- Partnering.
- Point of supply.
- Products v goods v materials.
- Public sector dependent suppliers.
- Reserved contract.
- Service provider.
- Spark framework RM6094.
- Subcontractor.
- Supply.
- Supply chain integration.
- Supply chain management.
- Tier.
- Tier 1 suppliers.
- Tier 2 and tier 3 suppliers
- Types of contractor.
- VAT reverse charge.
[edit] External references
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.