Highway drainage
Contents |
[edit] Introduction
The construction of roads affects the natural surface and subsurface drainage pattern of watersheds or hill-slopes. The provision of adequate drainage is important to prevent the accumulation of excess water or moisture on or within road constructions that can adversely affect their material properties, compromise overall stability and affect driver safety. Drainage must cope with water from the carriageways, hard shoulders, foot/cycle paths, verges, and adjacent catchment areas.
The design of highway drainage will depend on several factors, including:
- The intensity of rainfall expected.
- The size of catchment area.
- The permeability of the surfaces.
The road camber or cross-fall should be designed to cope with heavy water run-off. Insufficient cross-fall can increase the risk of vehicles skidding or aquaplaning on the surface water. The standard cross-fall for roads is usually taken as 1:40, although the camber will vary depending on the individual requirements of the road.
[edit] Urban roads
Surface water is generally collected in channels at the road-side and discharged through gullies (drainage gratings at the edges of the road) into storm water sewers. Gullies are typically positioned at intervals of 25-30 m, depending on the road width and nature of the cross-fall. Gully covers can be either top opening or side opening.
To reduce the number of required drainage points, pavings and verges should be graded towards the channel.
Culverts may also be used. A culvert is a closed conduit or tunnel used to convey water from one area to another, normally from one side of a road to the other side.
For more information, see Culvert.
[edit] Rural roads
Minor roads usually use simple openings or channels which feed into roadside ditches.
Most main roads use a system of gullies and piped sewers. However, soakaways may also be used to discharge water, these are large underground chambers into which water flows from a gully. Water collects and gradually soaks through holes into the surrounding ground or to streams and roadside ditches.
For more information, see Soakaway.
For roads with hard shoulders, it is usual for the kerb to be kept flush with the road surface, with a precast concrete channel placed at the outside edge to drain water. This channel discharges water into gullies.
[edit] Related articles on Designing Buildings Wiki:
- Bituminous mixing and laying plant.
- Catchment flood management plans.
- Code of Practice for Ironwork Systems Installation and Refurbishment.
- Drainage.
- Gulley.
- Highway engineers and drainage.
- Infrastructure.
- Kerbs.
- Manhole.
- Manhole cover.
- Overview of the road development process.
- Pavement.
- Planning for floods.
- Pumps and dewatering equipment.
- Road construction.
- Road improvement scheme consultation.
- Road joints.
- Runway construction.
- Section 50 agreement.
- Sewer construction.
- Soakaway.
- Successful road kerb trial.
- Sustainable urban drainage systems SUDS.
- Types of road and street.
- Water engineering.
[edit] External references
- ‘Introduction to civil engineering construction’ (3rd ed.), HOLMES, R., The College of Estate Management (1995)
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”