Restoration and Renewal
The Restoration and Renewal (R&R) Programme refers to the programme of refurbishment for the Palace of Westminster and was originallly established in 2013 by both of the Houses of Parliament. It was formalised with the passing of the Parliamentary Buildings (Restoration and Renewal) Act 2019 and underwent significant governance restructuring, with a new R&R Programme Board taking over in February 2023., which continued to be responsible for planning and carrying out the extensive work to refurbish the Palace of Westminster, home of the House of Commons and House of Lords.
A destination for more than a million visitors every year, it is also Ithe place of work for thousands of people and the heart of the UK and specifically England's centuries-old democracy. Most of the building dates from the Victorian era and some parts are significantly older. Over the decades, its fabric and its services have deteriorated and are increasingly in need of substantial repair or replacement. The Restoration and Renewal (R&R) Programme was established to deliver this work.
The R&R Programme says it will:
- Restore the iconic home of Parliament while ensuring value for money and supporting thousands of jobs and businesses across the UK.
- Preserve the Palace as an internationally recognised symbol of the UK and the home of Parliament for future generations.
- Directly benefit the thousands of staff who work here and one million people who visit each year, by improving accessibility, fire safety, reliability and efficiency of services, security, visitor access, and health and safety.
Background
- 2026: Delivering restoration and renewal of the Palace of Westminster: the costed proposals published.
- 2023: A new two-tier governance structure (Client Board and Program Board) was established, with the Programme Board meeting for the first time in February 2023.
- 2022: Governance restructuring announced to replace the initial sponsor body.
- 2019: The Parliamentary Buildings (Restoration and Renewal) Act 2019 received Royal Assent.
- 2016: Joint Committee report recommended a full decant
- 2015: Independent Options Appraisal published.
- 2013: Initial establishment of the programme.
[edit] Related articles on Designing Buildings
- 10 Downing Street.
- 2020 IHBC Gus Astley Student Awards.
- Big Ben.
- City Hall, London.
- Demolishing Whitehall.
- Enhanced Maintenance and Improvement EMI.
- Gothic revival style.
- Machicolation.
- Monument and context.
- Mr Barry's War.
- Nineteenth century building types.
- Oxford Movement.
- Palace of Westminster.
- Parliamentary procedure.
- Redesigning parliament to help end the Brexit deadlock.
- Restoring the Palace of Westminster's ventilation system.
- Scottish Parliament Building.
- St Pauls Cathedral.
- Strawberry Hill House.
- The Story of Kensington Palace.
- US Capitol Building.
[edit] Related links
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.