Project sponsor for building design and construction
On publicly-funded projects, the project sponsor (sometimes known as the project director or client manager ref Achieving Excellence Guide 2 - Project Organisation) is,
...the interface between the client team and supply team via the project manager, as the main day-to-day client representative'
Ref OGC Project sponsor.
The project sponsor might be equivalent to a board director in the private sector.
For a very detailed description of tasks to be performed by the Project Sponsor see OGC guide Project organisation: roles and responsibilities (bullets listed below).
- support the SRO (senior responsible owner) by :
- preparing business case and investment appraisals and updating as required
- ensuring that Gateway reviews are undertaken
- managing the resources allocated by the SRO
- working within delegated authorities, including health and safety
- coordinating and directing user input
- appraising options (with assistance from independent client advisers, as appropriate, and the project manager) and submitting them to the SRO for approval
- preparing the project brief for the project manager, making the role of design clear in setting the brief and achieving the goals of the project
- controlling changes (if required) following approval, ensuring that change control procedures are adhered to
- ensuring appropriate risk management on the project
- managing the project budget, including the risk allowance
- secure professional services for delivery of the project by:
- appointing the integrated supply team (see AE5:The integrated project team) coordinating and fostering teamwork
- determining the procurement route (see AE6:Procurement and contract strategies)
- producing the project execution plan, including the risk management plan, in collaboration with the project manager
- ensuring the project is managed in accordance with the project execution plan
- establishing formal reporting arrangements on project progress
- providing a focal point for all client contact with the supply team, providing approvals and decisions as necessary
- carry out a post project review with the integrated project team
- ensure effective feedback from the project by assisting the SRO in carrying out a post implementation review to inform the IDM and SRO of:
- how far the project met the department's interests and objectives
- what lessons need to be learned for the future (things done well and areas that need to improve).
The relationship between the project sponsor and the rest of the project team is illustrated in OGC guidance as shown below:
Illustration reproduced with permission from OGC ref Project organisation: roles and responsibilities.
NB The Office of Government Commerce (OGC) has now been absorbed into the Efficiency and Reform Group (ERG) within the Cabinet Office. OGC guidance has been archived, however, it is cited in the Government Construction Strategy and the Common Minimum Standards, and links are provided to OGC documents from government websites such as the Major Projects Authority. The OGC gateway review process still provides one of the best and most comprehensive sets of guidance for public projects. It is for this reason that the project plan for public projects within Designing Buildings Wiki follows the OGC gateway review process.
Improving Infrastructure Delivery: Project Initiation Routemap, Handbook, Version 2 June 2016, published by the Infrastructure and Projects Authority, states: ‘The sponsor organisation secures the funding, owns the business case and is responsible for specifying the requirements to the client. The Sponsor ensures that the project remains strategically aligned and viable, and that benefits are on track to be realised. In some contexts the Sponsor and Client could be from the same organisation.’
[edit] Related articles on Designing Buildings Wiki
- Champions.
- Independent client adviser.
- Integrated project team.
- Integrated supply team.
- Investment decision maker.
- Owner.
- Project board.
- Project manager.
- Senior responsible owner.
- User panel.
[edit] External references
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.
Comments