Coordination in the construction industry
Coordination (or co-ordination) refers to the process of organising people, systems, activities and so on so that they work together. Coordination is generally considered to improve efficiency and effectiveness, whilst fragmentation can cause inefficiencies and even clashes.
Coordination is a particular issue in the construction industry, where teams of people may come together to work on a complex design and construction involving many interrelated elements, and when the project is finished, they may disperse and might not work together again. Ensuring that this team works effectively together requires careful coordination, integration and collaboration – not something that the industry is always successful at achieving.
For more information see: Fragmentation
In the construction industry, co-ordination often refers to design coordination, that is, the integration of designs prepared by different members of the project team to create a single, unified set of information that can be constructed without clashes between components. Effective design coordination can help to reduce costs, delays and disruption that can be caused by problems on site and the need for remedial or abortive works and redesign.
For more information see: Design coordination.
Coordination in the construction industry may also refer to:
- BIM model coordination.
- Spatial coordination.
- Supply chain coordination.
- Coordination of documentation or policies.
- Coordination of construction activities.
- Coordination between bodies, such as government departments.
- Collaborative practices between project team members.
- Integration of systems, such as transport systems.
NB Roles in construction projects: analysis and terminology, by Hughes, W. and Murdoch, J. R, published in 2001 by the University of Reading, defines co-ordinate as: ‘Ensuring that information flows successfully between organizational links and assembling diverse outputs.’
[edit] Related articles on Designing Buildings
- BIM co-ordinator.
- Building information modelling.
- CDM coordinator.
- Clash avoidance.
- Collaborative practices.
- Design.
- Design coordination.
- Design coordinator.
- Design management.
- Fragmentation.
- Information manager.
- Integrated design.
- Lead designer.
- Modular co-ordination.
- Retrofit coordinator.
- Tolerances.
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.