An environmental plan (or environmental management plan (EMP)) is an essential tool for setting and managing environmental objectives for a project. Generally an environmental plan will be part of an environmental management system (EMS) and will sit within a hierarchical suite of documents:
- Environmental policy
- Environmental plan/environmental management plan (EMP)
- Method statements
- Work instructions
The over-arching environmental policy is a high-level statement of mission and principles in relation to environmental performance. It creates the framework for setting environmental objectives and targets and is often a public document. A project might simply adopt a client’s corporate environmental policy, or a project-specific policy might be prepared.
The environmental plan is the key document in the environmental management system and sets out the detailed, targets, objectives and procedures that will be adopted in order to achieve the goals set out in the environmental policy. On small projects it may form part of the brief, but on larger projects is likely to be a stand-alone document.
The environmental plan should:
- Identify roles and responsibilities
- Set specific, measurable targets.
- Set standards that must be adhered to.
- Identify risks and establish mitigation measures.
- Establish procedures for communication and training.
- Establish procedures for monitoring and reporting.
The environmental plan should be a live document that evolves throughout the life of a project, and so it is important to establish procedures by which it will be reviewed, revised and updated.
On large projects, there may be different detailed environmental plans for different aspects of the project or for different stages of work. For example, there is likely to be a specific construction environmental management plan (CEMP).
[edit] Environmental impacts
An environmental risk assessment should be undertaken when developing the environmental plan. This will identify areas of environmental impact and potential risks. Management procedures can then be put in place to eliminate, minimise or mitigate those impacts and risks. This might cover areas, such as:
[edit] Business planning
The need for a new building as opposed to doing nothing, refurbishment or changes in working practices.
[edit] Selection of consultants
Contractual requirements in relation to the selection of materials, monitoring and reporting, track record, environmental accreditation and qualifications of staff.
[edit] Selection of location
Availability of transport, the selection of a greenfield or brownfield site, the local availability of resources and services, the local infrastructure and local ecology.
[edit] Project brief
Procurement route, travel plan, working methods, standards, ecology and landscape, energy use and energy source, flexibility and durability, waste management, water management, material selection and pollution.
[edit] Design
Energy use and energy source, embodied energy, use of harmful materials, material sources, ecology and landscape, flexibility and durability, waste management, water management, disposal, travel plan, contamination and pollution and resilience to climate change.
[edit] Tender
Contractual requirements such as monitoring and reporting, working practices, track record, environmental accreditation and qualifications of staff.
[edit] Construction
Transport, embodied energy, use of harmful materials, material sources, working methods, site waste management plan, recycling, pollution, wheel washing, dust generation and noise nuisance, protection of ecology, traffic management, archaeology and heritage management, water management and contaminated land management.
[edit] Operation
Energy source, energy use, water management, maintenance, resource management, waste management, flexibility, durability, landscape and ecology, pollution, evaluation and feedback.
[edit] Disposal
Dismantling and demolition, re-use, re-sale and recycling, landscape and ecology, hazardous materials and pollution.
[edit] Enforcement
It is important that everyone involved in the project is aware of the environmental policy and environmental plan, and that they are bound by their requirements. Appointment documents should make clear the extent and standard of environmental performance and assessment that is required as well as requirements for monitoring and reporting. These requirements need to be cascaded down throughout the entire supply chain.
Environmental plans require policing, and this can be done at a number of different levels:
- A senior client champion should be appointed to take responsibility for environmental matters.
- Client environmental representative to manage environmental matters on a day to day basis. On a large project this can be a full-time job for a specialist.
- Contractor’s environmental manager.
- Contractor’s site environmental representative.
- Contractor’s site foreman.
These individuals need to carry out regular inspections, audits and reporting and must be empowered in order to be effective. It is all too easy to ignore environmental requirements, particularly when there are time or budgetary pressures, or when ‘emergencies’ crop up.
[edit] Outline plan
An outline for an environmental plan might include:
- Project description.
- Environmental policy.
- Environmental management system.
- Roles and responsibilities.
- Lines of communication and reporting requirements.
- Training.
- Complaints, incidents and emergency response procedures.
- Auditing, non-conformance and corrective action.
- Risk assessment.
- Objectives and targets.
- Planning, legislation, regulations and guidelines and permits required.
- Standards to be adopted.
- Method statements.
- Checklists.
- Registers.
- Review and revision procedures.
[edit] Related articles on Designing Buildings Wiki
- BREEAM.
- Construction environmental management plan.
- Definition of waste: Code of practice.
- Deleterious materials.
- Ecological impact assessment.
- Eco-Management and Audit Scheme EMAS.
- Embodied energy.
- Engineers and hurricanes.
- Environmental consultant.
- Environmental impact assessment.
- Environmental management procedures manual.
- Environmental management system.
- Environmental policy.
- ISO 14001.
- Leadership in Energy and Environmental Design.
- Performance gap.
- Protected species.
- Recycling.
- Resilience.
- Soil survey.
- Strategic ecology framework SEF.
- Sustainability.
- Sustainability aspirations.
- Sustainable materials.
- Sustainability outcomes.
- Sustainable procurement.
- Wheel washing system.
[edit] External references
- Buro Happold: Construction Environmental Management Plan.
- EMAS Eco-Management and Audit Scheme.
Featured articles and news
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”