Corrective action
PAS 55-1:2008, Asset Management: Part 1: Specification for the optimized management of physical assets, written by the Institute of Asset Management, and published by BSi in September 2008, defines corrective action as: ‘action to eliminate the cause of a detected nonconformity or other undesirable situation NOTE 1 There can be more than one cause for a nonconformity. NOTE 2 Corrective action is taken to reinstate capability and/or prevent recurrence, whereas preventive action is taken to prevent occurrence in the first place. [BS EN ISO9000:2005, 3.6.5]’
[edit] Related articles on Designing Buildings
- Asset.
- Asset information model.
- Asset management.
- Asset management strategy.
- Asset management team.
- Creating an asset register for construction projects.
- Digital asset management.
- Economic Order Quantity EOQ.
- Enterprise asset management.
- Facilities management.
- Knowledge asset management.
- Making good.
- Property management.
- Remediation.
Featured articles and news
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.






















