Wheel washing system
Wheel washing systems can be installed on construction sites to enable the wheels of plant, trucks and other vehicles to be cleaned before leaving the site. This is used to control and eliminate mud, slurry and other pollutants being deposited on public roads.
A requirement for wheel washing may be identified as part of an environmental risk assessment carried out prior to work beginning on site. It can also be particularly important on sites that contain land that is contaminated, and may be a requirement of planning permissions.
The system is typically located near to the site exit and instructions given to site operatives, delivery drivers and visitors that they are to use it before leaving.
There are two main types of wheel washing system:
- Roller: Each set of wheels is placed on the rollers and rotated as water sprays out from strategically-placed nozzles.
- Drive-through: The vehicle drives through and a sensor triggers the washing process.
The sludge which is washed off may be directed into a recycling tank, with the sedimentation of the solids accelerated by the use of flocculants. The solids which settle at the bottom of the tank are removed by an automatic scraper or excavating plant. The aim is for clean water to be used for every wash.
There are also 'environmentally-friendly' systems available which are stand-alone units involving water filtration and recirculation.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cumbria's vernacular architecture
A history of building impeded by unsettled times.
CIOB and MMC Ireland announce strategic partnership
For better working conditions, and a more productive construction sector.
More than just glass.
Grenfell Phase 2 final report for construction, at a glance
Twenty-three key issues raised and their recommendations.
Industry responds to the final Grenfell inquiry phase 2 report
Construction body responses to the long-awaited 7 volumes.
Chief construction advisers in brief
From July 2008 to November 2015.
The Grenfell phase 2 final report key summary points
And recommendations for the construction industry.
Approved Document B: Fire Safety upcoming updates
Including sprinklers in care homes, National classes and Fire resistance.
CIOB Podcast: 21st Century Construction
Catch up on the many previous episodes.
Tools and processes supporting a robust golden thread
BSRIA Handover Information and O&M Manuals guidance.
Industry survey highlights persistent skills gap
Building engineering business survey by ECA in partnership with BESA, SELECT and SNIPEF.
IHBC Conservation Professional Practice Principles
Spotlighted in HEF Historic Environment Overview.
CIAT collaborates with CIOB, CIfA, Icon to launch The Arc
Helping clients find specialist historic environment professionals.
Government building safety remediation data releases
Show some progress, but a 50% gap not yet started.
Testing For A Safer Future; an initial industry response
A response to the Independent Review of the Construction Product Testing Regime.
Requirements for UK buildings in certain circumstances.