Draughts in buildings
See also: Draught proofing and air draught.
Contents |
[edit] Introduction
A draught is a noticeable current of air inside a building and can make its occupants uncomfortable. Draught is the UK English spelling, the US English spelling, is ‘draft’, although in the UK this means to prepare text or drawings. The word ‘draught’ is thought to derive from the Old Norse ‘dráttr’ meaning to draw or pull.
Whilst all buildings require ventilation, that is, the replacement of ‘stale’ internal air with ‘fresh’ external air to dilute contaminants, remove moisture and so on, draughts are the uncontrolled supply of air that can be both uncomfortable and costly.
[edit] Causes of draughts
Draughts can be caused by:
- Poorly fitting doors and windows.
- Poor quality or defective windows or doors.
- Open chimneys.
- Defects in dot and dab.
- Ventilated crawl spaces under floors and gaps between floorboards.
- Penetrations through walls such as pipes and wires.
- Letterboxes and key holes.
- Vents in walls.
- Open doors or windows in another part of the building.
- Trickle vents in windows.
- Defective or poorly set up building services.
Draughts can also be experienced where there is a significant change of surface temperature within a building, such as a downdraught felt next to a cold, single-glazed or poor-quality window.
[edit] Indoor air velocities
Generally air velocities inside buildings are relatively low compared to the outside, however it is possible for the range of air velocities to be quite large. There may be entirely stagnant areas where air velocities are close to 0 m/s, whilst in tall spaces or in large mechanically ventilated spaces, internal air velocities can reach several m/s in some places.
Some more typical ranges are set out below:
0 m/s | Stationary air. |
0.1 m/s | The assumed internal air velocity in some simple heat transfer calculations. |
0.1 to 0.15 m/s and above | May be felt as a draught in a cold climate in the winter. |
0.3 m/s and above | May be felt as a draught in a cold climate in the summer. |
0.8 to 1 m/s and above | May be felt as a draught in a hot climate. |
For more information see: Indoor air velocity.
[edit] Air tightness testing
The Air Tightness Testing and Measurement Association (ATTMA) defines ‘air leakage’ as the '...uncontrolled flow of air through gaps and cracks in the fabric of a building. It is sometimes known as infiltration or draughts. Air leakage is not to be confused with ventilation, which is controlled airflow in and out of a building'.
An article on YouGen, suggests that In the typical UK house draughts will account for at least 10% of the total heat loss. If there is an unused open fireplace that figure can rise to more than 50%.
According to the Building Services Research and Information Association (BSRIA), 'Project teams should design and construct the building fabric to be reasonably airtight, and also provide natural or mechanical ventilation systems that maintain good indoor air quality while minimising energy use. In other words: Build tight, ventilate right.' Ref BSRIA Topic Guide - Airtightness.
In England and Wales, airtightness testing has been mandatory for virtually all new buildings since 2006.
See Airtightness testing for more information.
[edit] Remedies
Generally it is possible to feel draughts, however, they can also be detected with thermal detectors or located with candles.
Once located, remedies might include:
- Refurbishing doors and windows.
- Installing secondary or double glazing.
- Installing or repairing weather seals around windows and doors.
- Filling gaps around penetrations through walls.
- Sealing gaps between floor boards.
- Closing gaps in wall constructions.
- Closing off open chimneys (although it is important in this case that the chimney remains vented, both at the top and the bottom, and is filled for example with vermiculite, to prevent the accumulation of moisture).
- Installing or sealing internal doors or other openings to reduce the movement of air within the building.
- Changing operations so that doors remain closed (such as loading bays or receptions).
- Changing building services installations.
However, it is important that intended ventilation paths are not blocked. Air bricks, trickle vents, ventilation to under floor cavities and roof spaces, are provided for a reason, removing or blocking them can cause damp, mould and rot, as well as allowing the build-up of contaminants. Some appliances, such as wood-brining stoves must have ventilation provided if they have an output of more than 4.5kw.
During construction, the overall aim is to ensure the highest quality of workmanship on site. Materials and products in isolation very rarely fail; similarly drawings and specifications rarely fail. Generally, problems arise due to poor workmanship.
See Management and quality control measures for more information.
[edit] Draught risk
Thermal Comfort (TG 22/2023), written by David Bleicher and Calum Maclean and published by BSRIA in 2023 states: ‘The draught risk is a calculated value that incorporates the air speed, air turbulence and air temperature. Draught risk indicates a percentage of people who would be bothered by draught at the point measured.’
[edit] Related articles on Designing Buildings
- Accredited construction details ACDs.
- Achieving sustainable futures with thermal imaging.
- Air change rates.
- Air draught.
- Air permeability testing.
- Air tightness in buildings
- Airtightness of energy efficient buildings.
- Cold bridge.
- Computational fluid dynamics.
- Draught proofing.
- Energy audit.
- Expanding foam.
- Floor plenum airtightness.
- Indoor air quality.
- Indoor air velocity.
- Leaks in buildings.
- Primary air barrier.
- Thermographic survey.
- The history of non-domestic air tightness testing.
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.