Accredited construction details (ACDs) are a set of standardised junction details developed in 2002 that can be followed to ‘design out’ thermal bridges in compliance with the energy efficiency requirements (Part L) of the Building Regulations.
A thermal bridge (sometimes referred to as a cold bridge or thermal bypass) describes a situation in which there is a direct connection between the inside and outside of a building through one or more elements that are more thermally conductive than the rest of the building envelope. As a result, there can be wasteful heat transfer across those elements, and the internal surface temperature will be different from other, better insulated internal surfaces which can result in condensation.
The ACDs provide a description of how to construct standard details. They focus on insulation continuity and air tightness and provide checklists which can be used by designers, constructors and building control bodies to ensure provision has been made to eliminate all reasonably avoidable thermal bridges.
While they have primarily been developed in relation to the construction, alteration and extension of dwellings, they may also be valid for buildings other than dwellings where the construction details are similar.
The details are grouped by generic construction type:
- Steel frame details;
- Timber frame details;
- Masonry cavity wall insulation details;
- Internal walls, and
- Masonry external wall insulation details.
The ACDs have now been archived, and their status is not clear, however, they are still available to download from the national archive.
Further accredited details are available for Scotland 2015 and Northern Ireland 2015.
NB Part L 2021 Where to start, A guide for housebuilders and their advisors, Masonry construction, published by the Future Homes Hub in June 2022, states: ‘Typical construction details which were published in 2007 by the Department for Communities and Local Government to address issues with continuity of thermal and airtightness layers in construction. While ACDs are largely out of date, they have not been withdrawn and are still available for use.’
[edit] Related articles on Designing Buildings
Featured articles and news
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.