Site office
Construction sites will generally require office facilities to provide accommodation for site managers, provide space for meetings and to provide storage for site documentation. Site offices are often described as ‘site huts’ even if they are large and well fitted out.
It is important that site offices are comfortable, attractive and versatile, as well as being suitably robust and secure. Regulation 17 of the Construction (Design and Management) Regulations 2015 (the CDM Regulations) states:
‘A construction site must, so far as is reasonably practicable, have sufficient working space and be arranged so that it is suitable for any person who is working or who is likely to work there, taking account of any necessary work equipment likely to be used there.’
Each individual project will have different requirements for site office provision. On large projects separate offices may be provided for site foremen, engineers and the commercial and project management team.
As site offices are generally temporary in nature, only there for the duration of the construction works, they are often prefabricated, or constructed from portable, or modular, buildings, frequently referred to as ‘portacabins’ (although 'Portkabin®' with a 'k' is a trade marked brand name of Portakabin Limited). These are standard sizes and can be fitted together or stacked to form almost any configuration of accommodation required. They can include reception spaces, offices, meeting rooms, kitchens, toilets, showers, changing facilities, lockers, storage, and so on.
Site offices are easily transported on flat-bed trucks and set up on site using a crane. Typically they have four adjustable steel legs with attachments for stacking. Site office panelling is usually made of galvanised steel sheet and a rigid insulation core. A plasterboard inner lining is used for walls and ceiling. Windows are often designed to optimise light levels, with white walls and heavy-duty flooring that is easy to clean. Several manufacturers provide anti-vandal protection, such as pyro-shield windows with steel shutters and high-security steel doors.
They are often stacked with external metal stairs leading to the second floor. Large sites may have several inter-linked portable offices capable of holding hundreds of people, stacked up to three-storeys high with internal stairs and steel frame bracing.
They may be purchased or rented, and once construction is complete, either returned or take to a new site for re-use.
[edit] Related articles on Designing Buildings Wiki
- Lighting of construction sites.
- Main construction compound.
- Materials on site.
- Mobilisation.
- Off site materials.
- Office.
- Office definition.
- Office manual.
- Office space planning.
- Pre construction information.
- Site layout plan.
- Site facilities.
- Site storage.
- Temporary site services.
- Welfare facilities.
- Workplace definition.
[edit] External references
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
Featured articles
Green space, clean air and community lead the wish list for new homes...
CIAT invites the public to explore identity, belonging and architecture at London Festival of Architecture 2026.
Circular construction policies key to reversing nature loss in cities, says new IUCN report.
Met investigation into Grenfell Tower fire on track to submit all charging files to Crown Prosecution Service.
Living Wage Foundation clarifies paying apprentices the real Living Wage is not required for accreditation.
Call for evidence: Strategy for the built environment professions, trades and occupations.
UK Academy of Mould Experts, May
Free Mould Awareness self-paced beginner course.
IHBC’s Council: On ‘Don’t Waste Buildings’ – A blog feature following a Council chat post by Celia Clark.
The EPF urges publication of the Circular Economy Growth Plan.
ECA welcomes refreshed zero carbon targets.
Government consultation to look a new core product safety framework.
Construct Zero: Refreshed Programme and updated priorities.
New research highlights growing confidence gap in UK fire safety decision making.
Building control approval applications received, determination times, decision outcomes and performance.
Built Environment Wales – Regulatory Reform Conference.
ECA makes the airwaves on retentions ban proposal.
When will the Renters' Right Act come into force?