Construction site facilities
A number of facilities are required on construction sites to provide adequate welfare for workers. The Construction (Design and Management) Regulations (CDM Regulations) require the provision of:
- Sanitary conveniences.
- Washing facilities.
- Drinking water.
- Changing rooms and lockers.
- Facilities for rest.
For more information see Welfare facilities.
In addition, sites may include other facilities, such as:
- Welcome facilities and entry control.
- Site offices.
- Meeting rooms.
- Training and induction facilities.
- Wheel washing facilities.
- Site canteen.
- Off-loading facilities.
- Laydown area.
- Temporary storage and storage areas.
- Sub-contractor facilities.
- Car parking.
- Waste management and recycling facilities.
- Fabrication facilities.
- Facilities for the construction of mock-ups for testing.
In order that the site can operate efficiently and safely, it is important that these facilities are laid out properly on the site. Site layout planning involves four basic processes:
- Identifying the site facilities that will be required.
- Determining the sizes, and other constraints of those facilities.
- Establishing the inter-relationships between the facilities.
- Optimising the layout of the facilities on the site.
See Site layout plan for more information.
[edit] Related articles on Designing Buildings Wiki
- Attendance.
- CDM planning period.
- Construction phase plan.
- Handover to the contractor.
- Human resource management in construction.
- Laydown area.
- Lighting of construction sites.
- Main construction compound.
- Office manual.
- Pre-construction information.
- Principal contractor.
- Site layout plan.
- Site office.
- Site plan.
- Site storage.
- Sub-contractor.
- Temporary site services.
- Temporary structures
- Temporary works.
- Welfare facilities.
- Wheel washing system.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

























