[edit] The role of plumbing and heating in schools
Making learning environments safe and comfortable places for students and staff is a top priority for schools up and down the country. Plumbing and heating systems have a key role to play in creating spaces that are conducive to effective teaching and learning; they elevate safety and performance at every point of use.
There are more than 30,000 schools and academies in the UK, providing dedicated learning environments for more than ten million pupils and employment for more than 600,000 teaching staff. For each of these environments to be effective, it is essential for buildings to perform optimally, including their plumbing and heating systems.
Essential to the smooth, safe and efficient running of schools, plumbing and heating systems must withstand high levels of usage every day, as well as perform reliably for years to come to maximise the stretched budgets of individual schools.
To achieve this, specification is key in equipping schools with the systems they and their pupils will need to rely on.
[edit] Optimising systems for health and safety
Health and safety should be a primary consideration. Accommodating users of all ages, schools should be acutely aware of protecting users from risks such as scalding, as well as diseases such as Legionnaires.
To protect people at the point of use, Thermostatic Mixing Valves (TMVs) can be installed at each outlet, ensuring water temperatures do not exceed 46 degrees Celsius and therefore do not pose a scalding risk. To provide adequate performance and meet the required standards, it is essential that schools use TMV2-approved valves, unless the users are likely to be at a higher risk of scalding. Higher risk users could be those with disabilities, or children of nursery age. In these environments, only TMV3-approved valves should be installed.
To protect users over the long-term, valves should also be easy to access, supporting future maintenance and servicing. Along with testing at time of installation, interim testing should take place every six months for TMV3 valves, and every twelve months for TMV2 valves.
Schools generally have larger hot water systems and user demand is constant, so secondary circulating hot water systems are becoming more common to enable instant hot water at the outlets. It is essential to thermally balance this type of system to ensure optimum efficiency from the heat source; unbalanced systems create a host of problems, from inconsistent hot water availability to creating environments for harmful bacteria to grow. Thermal Balancing Valves (TBVs) negate these challenges. Installed at various points across a system, they safely provide a constant and stable supply of hot water and regulate the flow of water in line with temperature.
Aside from risks such as scalding, specifiers should also seek to prevent against backflow, which is when pressure fluctuations move water in the opposite direction and contaminate the supply. Schools are Fluid Category 4 and as such require the installation of Reduced Pressure Zone (RPZ) valves as standard for this.
[edit] Future-proofing systems
Besides safety, the longevity and reliability of plumbing and heating systems is paramount for schools, enabling them to withstand heavy usage and remain functional for years to come. In practice, effective specification helps schools to maximise their budgets and deliver consistent value for all stakeholders.
Along with protecting users from some of the common challenges associated with hot water systems, effective specification also improves ongoing maintenance. Through effective system planning, regular maintenance and servicing gets carried out quickly and accurately, maximising lifespan and performance.
This article appears in the AT Journal issue 150, summer 2024 as 'School Specification 101: plumbing and heating systems in our schools' and was written by Richard Bateman, Product Marketing Manager, RWC.
--CIAT
[edit] Related articles on Designing Buildings
- Baseline designs for schools.
- BIM for mechanical electrical and plumbing drawings.
- Building Bulletin 93: acoustic design of schools.
- Broadmeadows Primary School.
- Building Schools for the Future BSF.
- Building energy management systems BEMS.
- Building management systems.
- Building services.
- CIBSE Case Study Bushbury Hill Primary School.
- Cooling systems for buildings.
- Energy management and building controls.
- Frequently Googled plumbing and electrical problems.
- Heating.
- How BIM can cause needless early stage MEP design concerns.
- HVAC balancing.
- Mechanical ventilation.
- Mechanical, electrical and plumbing MEP.
- MEP BIM and the building lifecycle.
- Pipework.
- Plant room.
- Plumbing.
- Radiator.
- Rising main.
- Thermal comfort.
- Types of building services.
- Types of heating system.
- Ultrasonic pipe testing.
- Valves.
- Water Regulations Advisory Scheme WRAS.
- What is BB101?
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.