Baseline designs for schools
The baseline design for schools guidance was developed by The Education Funding Agency (EFA) in response to a recommendation in the Review of Education Capital, in April 2011 which identified the requirement for a set of standardised drawings and specifications that could be used across a variety of educational institutes. The EFA is an executive agency, sponsored by the Department for Education (DFE).
The guidance documents are aimed at contractors, local authorities, school promoters and school building teams, along with other interested parties including governing bodies and leaders of schools. They are suitable for both primary and secondary schools.
They provide assistance with good practice design for the Priority School Building Programme (PSBP) and are detailed enough to enable environmental modelling and to establish building costs. The PSBP was established in 2011 to address the needs of those schools in the worst condition that required urgent repair. The programme is centrally managed and procured by the Education Funding Agency.
To deliver 'the maximum benefit for schools', the cost per square metre in the guidance has been reduced to £1113/m2 (excluding external works, fees and certain circumstances). The area has also been reduced, according to the guidance, 'without compromising the educational facility'. In secondary schools, teaching spaces and non-teaching areas are within the same minimum limits as before, but in primary schools the ICT room has been omitted, due to the widespread use of portable ICT equipment in classrooms.
There are a suite of designs available together with associated drawings and technical analyses:
- Baseline design: 105 place primary school with a 26 place nursery.
- Baseline design: 180 place primary school with a 26 place nursery.
- Baseline design: 210 place primary school with a 26 place nursery.
- Baseline design: 240 place primary school with a 26 place nursery.
- Baseline design: 600 place secondary school.
- Baseline design: 630 place primary school.
- Baseline design: 1,120 place primary school.
- Baseline design: 1,200 place secondary (practical specialism).
- Baseline design: 1,200 place secondary (academic specialism).
- Baseline design: finger-block 1,200 place secondary school.
- Baseline design: 1,200 place secondary (music and sports).
- Baseline design: superblock 1,200 place secondary school.
- Baseline design: 1,850 place secondary school.
[edit] Related articles on Designing Buildings Wiki.
- Building Bulletin 93: acoustic design of schools.
- Building Schools for the Future.
- Free schools.
- Priority School Building Programme.
- RIBA client adviser.
- Special educational needs: an analysis of the necessities for inclusion
[edit] External references
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.