Information requirements process map
On projects that use building information modelling (BIM), an information requirements process map may be developed as a pre-cursor to producing full employer's information requirements (EIR).
It can be a helpful format for identifying the key decisions that it will be necessary to make during the development of the project, and the questions (sometimes referred to as plain language questions) that will need to be answered at those decision points. The information that the employer will need in order to answer those questions can then be identified.
An example of an initial information requirements process map is presented below. This might be developed to include additional details, such as; the format that information should be prepared in, the organisation that will prepare the information and the individual or group responsible for making the decision.
This can help define roles and responsibilities, the need for appointments to be made, and the scope of services for those appointments and is a good basis for preparing the employer's information requirements which will become part of the contract documentation.
Featured articles and news
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down £1bn
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.