How to Select the Appropriate LOD for BIM?
Contents |
[edit] Introducing levels of development and detailing
Decisions are critical to the success of any building project, and the Architecture, Engineering, and Construction (AEC) business frequently underperforms owing to poor decisions. Structured creative design methods are critical for increasing efficiency. Building Information Models (BIM) are frequently used in design processes to facilitate information flow and visualisation. Understanding which building elements and trades should be developed at what period and level is critical for successful design management. Level of Detailing (LOD) can enhance communication between designers and construction professionals, boosting trust and efficiency within the project team. This article will detail the different development levels that may be employed in a project and how to choose the most appropriate one.
According to Autodesk, LOD is a defined framework for determining the level of complexity and accuracy necessary in a BIM model at various project stages.
[edit] Various levels of detail in a project
The American Institute of Architects (AIA) created the Six Levels of Development (LOD) in 2008 to help BIM modelling teams communicate and give element/component detail for particular architectural components. According to BIM Forum (2013), LOD 100-500 enhances BIM planning, budgeting, allocation, communication, and scheduling while reducing over-modelling and rework.
[edit] LOD 100 – Conceptual Model
Model elements are visually represented at this LOD conceptual level using generic forms and symbols, like project-representing bricks. To comprehend the design and spatial needs, spaces are modelled as generic objects with approximative sizes, forms, and placements. Depending on how much space is needed for the design, blocks or space objects are arranged either randomly or by blocking and stacking.
LOD 100 is beneficial in the following scenarios:
- Investigation and On-Site Monitoring
- Putting all of the research together
- Generation of a 3D model
- Conceptual Design Visualization and its Connection to Zoning Regulations
[edit] LOD 200 – Schematic Model
LOD 200 depicts model elements graphically as generic systems, objects, or assemblies, with approximations for specifications, quantities, size, form, location, and orientation. Bounding components such as walls, elevations, and columns establish the border and size of LOD 200 spaces, as do vertical bounding elements and associated space objects.
LOD 200 is useful for the following scenarios:
- 3D modelling for form and layout
- Conceptual Design Development
- Coordinate spatially and find clashes
- Initial energy analysis
- Provide early cost estimates
[edit] LOD 300 – Design Development Model
Models with correct design data, including number, size, placement, orientation, detailing, fabrication, assembly, and installation, are found at LOD 300, much like in Construction Documents (CD). Since it includes detailed shop drawings, assembly specifications, and non-geometric data integrated into model parts, this level is helpful throughout the building process.
LOD 300 is beneficial in the following scenarios:
- Thorough 3D modelling of structural elements
- Proper component placement and sizing
- Trade coordination (MEP, structural, and architectural)
- Clash detection and BIM coordination
[edit] LOD 350 – Construction Detailing
Element 350 LODs give details about interfaces, supports, and connections for building systems. They indicate how one system relates with another and provide coordination elements to adjacent or similar elements. The model quantifies quantities, sizes, shapes, locations, and orientations without reference to unmodelled such as call-outs or notes.
LOD 350 comes in very handy in a variety of situations:
- Detailed three-dimensional models for materials and objects
- Creating construction documentation like drawings and specifications
- Calculating and deducting quantities for completion
- Ensure proper construction order and schedule
[edit] LOD 400 – Fabrication Model
Developing component-level information, creating shop drawings, integrating manufacturing processes, creating 3D models, organising prefabrication and construction, and incorporating non-geometric data are all part of the LOD 400 stage. This makes it possible for suppliers to give building component makers the comprehensive information found in the LOD 400 elements right away.
LOD 400 is useful for:
- Developing component-level information
- Creating shop drawings and requirements
- Integrating manufacturing processes
- Creating 3d models for off-site fabrication
- Scheduling prefabrication and construction
[edit] LOD 500 – Operational Model
The model at this level contains all the geometry and data required for lifetime operations and maintenance. It includes post-construction limitations, completed and installed elements, and field-verified locations. To replicate real-world conditions for facility management and maintenance, the model additionally includes non-geometric factors such as size, form, and orientation.
LOD 500 is advantageous in the subsequent circumstances:
- Create precise As-Built models that accurately depict real buildings
- Integrate data from operations and maintenance
- Carry out lifetime analysis and maintenance scheduling
- Complete building performance monitoring and analysis
[edit] Conclusion
BIM-oriented scenarios, in the AEC industry, utilise LOD as a language to effectively communicate project requirements. LOD plays a role in reducing inconsistencies in BIM models thereby enhancing communication and transparency amongst construction experts. It establishes an understanding of project completion eliminating any disparities. By leveraging methodologies and technology LOD enhances design clarity and facilitates communication and collaboration amongst teams, from different disciplines.
[edit] Related articles on Designing Buildings
- Asset information model.
- Benefits of manufacturer-created BIM models.
- BIM dimensions.
- BIM dimensions, maturity and levels of development.
- BIM execution plan.
- BIM for dummies - an interview.
- BIM levels of development (LOD).
- Centrally procured public projects.
- Construction Operations Building Information Exchange (COBie).
- CIC BIM Protocol.
- Common data environment.
- Data drops.
- Federated building information model.
- Government Construction Strategy.
- Industry Foundation Classes.
- Information manager.
- Level 2 BIM.
- Level 3 BIM.
- Level of detail.
- Open data.
- PAS 1192-2:2013.
- PAS 1192-3:2014.
- Project information model.
- The 4 Stages of BIM Process in Construction.
- Uniclass.
[edit] External links
https://marsbiminternational.com/insights/resources/level-of-detailing-development-lod/
BIM Directory
[edit] Building Information Modelling (BIM)
[edit] Information Requirements
Employer's Information Requirements (EIR)
Organisational Information Requirements (OIR)
Asset Information Requirements (AIR)
[edit] Information Models
Project Information Model (PIM)
[edit] Collaborative Practices
Industry Foundation Classes (IFC)