Flue Gas Recovery Systems FGRS
Flue gas recovery systems (FGRS), or more accurately also known as flue gas heat recovery systems (FGHRS) capture and reuse waste heat from exhaust flue gases, these are used to preheat water or other fluids, improving energy efficiency by reducing demand and thus reducing emissions.
The UK government document "Review of the methodology for FGHRS in SAP. Final report" describes the systems thus:
"Flue gas heat recovery units are devices that can be used with combi boilers to improve the efficiency of domestic hot water (DHW) production. They are designed such that incoming mains water is preheated before entering the boiler by exposing it (via a heat exchanger) to the exiting flue gases and extracting the otherwise wasted heat. The amount of available energy for recovery is limited by the flue gas temperature (FGT), the water vapour content and state, and this in turn is determined by the type of boiler and central heating temperature.
"The effect of pre-heating the incoming mains water means that less heat is required to be input from the boiler to raise the temperature of the DHW to that required for delivery. This can lead to savings in terms of gas used by the boiler and, as water at the right temperature can be delivered more quickly, there can be additional savings from reducing the amount of lukewarm water that is rejected by the user before it is hot enough."
FGRSs can be classified by the type of heat exchanger being used (e.g., air-to-air, air-to-water), the method of heat recovery (e.g., regenerative, recuperative), or the specific application and equipment, such as economisers, air pre-heaters, waste heat boilers, or heat recovery steam generators (HRSGs). Other systems also include heat pumps and dedicated flue gas heat recovery systems (FGHRS) for boilers and Storage Flue Gas Heat Recovery Systems (SFGHRS)
SFGHRS are described in the same document thus "in such devices the store of water is heated by the flue gases via the heat exchanger. This volume of water may be contained in the same unit around the flue, or in a cylinder next to the primary FGHRS unit. The store may be insulated, depending on the store location and the manufacturer’s design."
[edit] Related articles on Designing Buildings
- Air conditioning.
- Back boiler.
- Biomass boiler.
- Boiler efficiency.
- Boiler.
- Carbon monoxide.
- CHP boiler.
- Coefficient of Performance CoP.
- Combustion appliance.
- Combination boiler.
- Condensing boiler.
- District energy.
- Domestic micro-generation.
- Exhaust air heat pump.
- Fluepipe.
- Geothermal pile foundations.
- Gross calorific value.
- Heat exchanger.
- Heat interface units.
- Heat pump.
- Heat recovery ventilation.
- Heat recovery for buildings.
- Heat source.
- Hot water.
- Heating.
- HVAC.
- Mechanical ventilation.
- Mechanical ventilation's role in improving indoor air quality.
- Refrigerants.
- Tempering heating.
- Types of boiler.
- Types of heating system.
- Types of heat exchanger.
- Variable refrigerant flow.
- Waste heat.
- Waste water.
- Zero Bills Home.
Featured articles and news
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.























