Combination boiler
Combination boilers, or ‘combi boilers’, supply central heating and hot water directly from the water supply, without the need for a water tank or hot water cylinder.
Because hot water is supplied ‘instantaneously’ rather than being stored and then used, they can provide unlimited hot water on demand, and are useful where there is limited space availability. This can be a more efficient type of boiler, as the hot water is used immediately, rather than being stored.
However, as there is no reservoir of hot water, when there are multiple simultaneous uses, the pressure may drop. This may make them best suited to smaller, lower-occupancy properties.
The English Housing Survey, Headline Report, 2020-21, published by the Department for Levelling Up, Housing and Communities in 2021, defines a combination boiler as a boiler that: ‘provides hot water or warm air for space heating and can provide hot water on demand negating the need for a storage cylinder, therefore requiring less space.’
[edit] Related articles on Designing Buildings
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.






















