Concept design report
One of the outputs of the concept design stage is to produce a report which records the design concepts for major aspects of the project that might be worth developing as detailed designs. The report also identifies instructions required from the client.
The concept design report might include:
- The aims and objectives of project.
- A summary of the project brief.
- Areas of compliance and divergence between the concept design and the project brief.
- Identification of constraints, including local context, site levels, access, buildability, manufacturing, financial and local authority planning and building regulations.
- The outcome of key consultations.
- Statement of how the design meets the client's needs.
- Site context and strategy.
- Design and access statement.
- Site layout, including car parking, hard surfaces, water features, art etc.
- Landscape strategy.
- Layout of accommodation, including analysis of adjacencies between functions.
- Sections.
- Elevations.
- 3D visualisations and/or physical models.
- Fire strategy.
- Services strategy including emissions targets.
- Information and communications technology (ICT) strategy.
- Maintenance strategy.
- Quality standards.
- Materials.
- Definition of key construction elements, standardisation and non standard elements.
- Prefabrication and mass production opportunities.
- Long-lead items.
- Proposals for major engineered systems such as: cladding, mechanical and electrical equipment, lifts, and structural frames.
- Potential requirement for specialist design.
- Outline proposals for structural systems and where appropriate method of demolition.
- Outline proposals for building services systems.
- Schedules of accommodation.
- Planning strategy.
- Soft landings strategy.
- Cost plan, providing a break-down of the capital and ‘life cycle’ costs and identifying potential cost problems and cost reduction possibilities.
- Procurement options such as two-stage tendering.
- Programme and phasing.
- Buildability and construction logistics.
- The use of materials and the potential for re-use and recycling.
- Waste handling (see also site waste management plan).
- Sustainability.
- Risk assessment.
- Health and safety issues.
- Areas requiring further research.
- Instructions required.
The concept design report should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
Where building information modelling (BIM) is being used, publication of the concept design report may be part of a 'data drop' or 'information exchange' intended to ensure the project is properly validated and controlled as it develops. This may include:
- Models (Industry Foundation Classes (IFC) models and native project information models).
- Data structures (such as COBie files and schedules).
- Reports (typically PDF’s, although native files can be more useable).
[edit] Related articles on Designing Buildings Wiki
- Concept design.
- Concept architectural design.
- Concept architectural design checklist
- Concept services design.
- Concept structural design.
- Constraints.
- Data drop.
- Design and access statement.
- Design methodology.
- Design phase.
- Detailed design.
- Detailed design report.
- End of stage report.
- Gateways.
- Outline planning permission.
- Outline specification.
- Project brief.
- Site waste management plan.
- Soft landings.
- Stage 2 design report.
- Sustainability.
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.






















Comments