Concept design report
One of the outputs of the concept design stage is to produce a report which records the design concepts for major aspects of the project that might be worth developing as detailed designs. The report also identifies instructions required from the client.
The concept design report might include:
- The aims and objectives of project.
- A summary of the project brief.
- Areas of compliance and divergence between the concept design and the project brief.
- Identification of constraints, including local context, site levels, access, buildability, manufacturing, financial and local authority planning and building regulations.
- The outcome of key consultations.
- Statement of how the design meets the client's needs.
- Site context and strategy.
- Design and access statement.
- Site layout, including car parking, hard surfaces, water features, art etc.
- Landscape strategy.
- Layout of accommodation, including analysis of adjacencies between functions.
- Sections.
- Elevations.
- 3D visualisations and/or physical models.
- Fire strategy.
- Services strategy including emissions targets.
- Information and communications technology (ICT) strategy.
- Maintenance strategy.
- Quality standards.
- Materials.
- Definition of key construction elements, standardisation and non standard elements.
- Prefabrication and mass production opportunities.
- Long-lead items.
- Proposals for major engineered systems such as: cladding, mechanical and electrical equipment, lifts, and structural frames.
- Potential requirement for specialist design.
- Outline proposals for structural systems and where appropriate method of demolition.
- Outline proposals for building services systems.
- Schedules of accommodation.
- Planning strategy.
- Soft landings strategy.
- Cost plan, providing a break-down of the capital and ‘life cycle’ costs and identifying potential cost problems and cost reduction possibilities.
- Procurement options such as two-stage tendering.
- Programme and phasing.
- Buildability and construction logistics.
- The use of materials and the potential for re-use and recycling.
- Waste handling (see also site waste management plan).
- Sustainability.
- Risk assessment.
- Health and safety issues.
- Areas requiring further research.
- Instructions required.
The concept design report should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
Where building information modelling (BIM) is being used, publication of the concept design report may be part of a 'data drop' or 'information exchange' intended to ensure the project is properly validated and controlled as it develops. This may include:
- Models (Industry Foundation Classes (IFC) models and native project information models).
- Data structures (such as COBie files and schedules).
- Reports (typically PDF’s, although native files can be more useable).
[edit] Related articles on Designing Buildings Wiki
- Concept design.
- Concept architectural design.
- Concept architectural design checklist
- Concept services design.
- Concept structural design.
- Constraints.
- Data drop.
- Design and access statement.
- Design methodology.
- Design phase.
- Detailed design.
- Detailed design report.
- End of stage report.
- Gateways.
- Outline planning permission.
- Outline specification.
- Project brief.
- Site waste management plan.
- Soft landings.
- Stage 2 design report.
- Sustainability.
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Comments