Asbestos cement
Asbestos cement (AC), also known as ‘fibro’ or AC sheet, is a thin cement sheet or panel which is given rigidity by the inclusion of asbestos fibres. Asbestos cement can be moulded into any shape that ordinary wet cement can, but typically, it is formed into flat or corrugated sheets or piping. AC is generally grey or brown in appearance and has a coarse texture.
AC became popular during and post-World War II as a means of building inexpensive structures. It was also promoted as a fire-resistant alternative to more common roofing materials such as asphalt as well as an affordable alternative to timber shingles, brick, slate and stone. Today, AC is commonly found in the roofs and walls of old sheds, garages or in soffits beneath eaves.
The use of AC has been banned in several countries. This is because it contains asbestos and when it ages it releases tiny fibres into the air which can be inhaled in the lungs and may increase the risk of lung diseases.
Contractors for licensable asbestos removal are held on a list by the Health and Safety Executive (HSE). However, AC panels are a non-licensable asbestos product, which means they may be removed by non-licence holders but the work must be carried out in accordance with HSE requirements by suitably-trained personnel.
The removal of AC panels is an exception, as the asbestos is in a bound matrix that is generally capable of remaining rigid without releasing fibres into the air. Panels may be discoloured or cracked in places but this will not negatively affect their integrity and make them hazardous. AC panels can be found indoors, but as long as they are undamaged they do not need to be removed, but should be subject to regular checking, and can be sealed with paint or sealant.
In the UK, there is no legal requirement to dispose of AC, but care should be taken not to damage the panels in a way that could generate dust, thereby releasing fibres. If homeowners require it, they can arrange the disposal of AC panels with the help of the local council.
Safe steps to take when removing AC sheets include:
- Using a water sprayer to dampen the area around bolts and fasteners and reduce dust.
- Avoiding the application of pressure to panels which could cause them to break.
- Avoiding cutting, breaking or doing anything to panels which could generate dust.
- Lowering the panels carefully and placing them in strong polythene sacks sealed with tape.
- Clearly labelled the sacks as containing AC.
- Removing any debris.
- Cleaning equipment, surfaces and protective clothing that may have dust on them.
The Control of Asbestos Regulations 2012 suggests that “asbestos cement” means a material which is predominantly a mixture of cement and chrysotile and which when in a dry state absorbs less than 30% water by weight.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.


























Comments