Permitted development rights refer to the right for an owner to make changes to a property without the need for planning persmission, the specifics of what is covered by permitted development rights can be complex and has changed overtime. For information about the changes to these rights over time see the article about Permitted Development.
The typpes of alterations that might be considered a right to carry out without planning permission could include:
- Enlargements or alterations to houses (not exceeding 50% of the curtilage) under certain cirtcumstances.
- Provision of certain pet enclosures, sheds and fuel storage containers (not exceeding 50% of the curtilage).
- Certain porches, doors and windows.
- Installation of antenna, satellite dishes (specified sizes) or microgeneration systems under MCS guidance.
- Gates, fences, walls and other enclosures (no more than 2 m high).
- The provision of certain hard surfaces and means of access to a highway.
- Installation and alterations to certain chimneys.
- The installation of CCTV for security purposes.
- Exterior painting (other than advertisements) and internal alterations.
- Certain changes of use class.
- Temporary structures and plant for construction purposes or remaining for no more than 28 days.
The Town and Country Planning (General Permitted Development etc.) (England) (Amendment) Order 2024 was made and laid before Parliament on 30 April 2024, it came into force on 21 May 2024. The changes brought about by the new order aimed to streamline and expand permitted development rights in specific areas, in particular agricultural buildings, simplifying the process of converting and developing properties without the need for full planning permission.
On 4 February 2025 the Permitted Development Rights (Extension) Bill, a private member’s bill tabled by Lord Lucas (Conservative) was published. The Permitted Development Rights (Extension) Bill [HL] would establish new PDRs in primary legislation in England and Wales, they are currently made available through secondary legislation.
The PDRs proposed in the bill are listed in its schedule and would apply to developments including; making changes to the height of the roof of a building, adding side and rear extensions, raising party walls, adding floors to a bungalow, increasing the height of buildings in town centres by up to four stories, installing air source heat pumps, solar panels and electric vehiclecharging points.
The schedule also sets out criteria that developments should meet in order to qualify for the new PDRs created by the bill. For example, the bill states the ridge height and eaves of a building may only be raised by up to one metre in order for the development to qualify. Other specifications include limits to the size of side or rear extensions to a property and to the maximum height that solar panels placed on top of a building may rise above the roof. Developments would also need to meet general restrictions set out in the bill: That developments must not erase a right of way or an easement, infringe on the right to light, substantially reduce the light available to existing solar panels or infringe on other private rights unless this is agreed with the other parties concerned. It also states PDRs would not apply to listed buildings.
The bill would enable a planning authority to impose design requirements in relation to PDRs (though these may not have the effect of making a development “unreasonably impracticable or uneconomic”) and assigns them powers to impose:
- measures to slow the run-off of rainwater from the property being developed
- requirements concerning the building’s structural safety
- standards for insulation or energy efficiency
- requirements for new roof areas created as part of the development, such as a requirement to install a ‘green roof’ (a roof partially or completely covered by vegetation)
The specific requirements that would be applied would be established by the secretary of state using delegated powers in the bill. The planning authority would also be given the power to impose charges to cover the cost of providing additional infrastructure if the development increased the number of rooms in a property beyond a limit set out in secondary legislation.
The bill includes a further restriction on the application of the new PDRs for the development of residential buildings in medium and high flood risk areas (flood risk vulnerability classifications 2 and 3). Properties in these areas would need to be “well served by public transport” (the definition of which would be set out in secondary legislation) and modified to be flood resilient in order to qualify for PDRs.
[edit] Related articles on Designing Buildings
- Alterations to existing buildings.
- Article 4 direction.
- Change of use class.
- Changes to permitted development rights for agricultural buildings in 2024.
- Class Q permitted development.
- CLC calls for rethink of permitted development rights.
- Conservation area.
- Curtilage.
- Enforcement notice.
- Established use certificate.
- Exploring Lesser-Known Permitted Development Rights for Change of Use.
- IHBC responds to supporting defence infrastructure and the future of time-limited permitted development rights.
- Lawful development certificate.
- Listed building.
- Local development order.
- National planning policy framework.
- Party walls, rights of light and permitted development rights.
- Permitted development.
- Permitted development: The end of the high street or a blessing in disguise?
- Permitted development rights for the change of use of agricultural buildings.
- Planning enforcement.
- Planning fee.
- Planning permission.
- Prior approval.
- Renovation.
- Restriction of permitted development rights for pubs.
- Section 215.
- Sui generis.
- Town and Country Planning Act.
- Town and Country Planning (General Permitted Development) (Amendment) (England) Order.
- Use class.
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.