Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
Permissions may be the subject of planning conditions, where, rather than refusing a planning application, a local planning authority might grant permission, but might for example restrict the use of the site or, require additional approvals for specific aspects of the development.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest.
The National Planning Policy Framework (NPPF) states ‘...local planning authorities should act proportionately in responding to suspected breaches of planning control. Local planning authorities should consider publishing a local enforcement plan to manage enforcement proactively in a way that is appropriate to their area. This should set out how they will monitor the implementation of planning permissions, investigate alleged cases of unauthorised development and take action where it is appropriate to do so.’
The Town and Country Planning Act 1990 sets time limits for enforcement, after which developments are immune from action. In most cases, these are:
- Within four years of substantial completion for a breach of planning control consisting of operational development.
- Within four years for an unauthorised change of use to a single dwellinghouse.
- Within ten years for any other breach of planning control (changes of use).
Possible enforcement actions include:
- No formal action.
- Retrospective planning application.
- Planning contravention notice (to require information or seek suggestions for how to remedy the breach).
- Enforcement Notice (giving notice of what the breach is and setting out the steps the local authority require to remedy the breach).
- Planning Enforcement Order (when a person has deliberately concealed unauthorised development, a planning enforcement order enables action to be taken notwithstanding the fact that the time limit may have expired).
- Stop Notice (prohibiting activities in a related enforcement notice).
- Temporary Stop Notice (requiring that an activity which is a breach of planning control should stop immediately).
- Breach of Condition Notice.
- Injunction.
For more information see Planning Practice Guidance, Planning enforcement – overview.
It is illegal to disobey an enforcement notice (unless it is successfully appealed) and failure to comply can result in prosecution.
Building owners may appeal to the Planning Inspectorate against an enforcement notice on specific grounds as long as the appeal is received by the Planning Inspectorate before the ‘effective date’ on the notice. See Planning Portal Enforcement appeals for more information.
However, it is important to note that enforcement action is discretionary and so it may be more productive to seek early engagement with the local authority and to attempt to negotiate an agreement before an enforcement notice is served, rather than appealing.
[edit] Related articles on Designing Buildings
- Avoiding planning permission pitfalls.
- Development management.
- Enforcement activity.
- Enforcement notice.
- How long does it take to get planning permission.
- How long does planning permission last.
- Listed buildings.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning obligations.
- Planning permission.
- Retrospective planning application.
- Stop notice.
- Temporary stop notice.
[edit] External references
Featured articles and news
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.