Planning enforcement powers
Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
Permissions may be the subject of planning conditions, where, rather than refusing a planning application, a local planning authority might grant permission, but might for example restrict the use of the site or, require additional approvals for specific aspects of the development.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest.
The National Planning Policy Framework (NPPF) states ‘...local planning authorities should act proportionately in responding to suspected breaches of planning control. Local planning authorities should consider publishing a local enforcement plan to manage enforcement proactively in a way that is appropriate to their area. This should set out how they will monitor the implementation of planning permissions, investigate alleged cases of unauthorised development and take action where it is appropriate to do so.’
The Town and Country Planning Act 1990 sets time limits for enforcement, after which developments are immune from action. In most cases, these are:
- Within four years of substantial completion for a breach of planning control consisting of operational development.
- Within four years for an unauthorised change of use to a single dwellinghouse.
- Within ten years for any other breach of planning control (changes of use).
Possible enforcement actions include:
- No formal action.
- Retrospective planning application.
- Planning contravention notice (to require information or seek suggestions for how to remedy the breach).
- Enforcement Notice (giving notice of what the breach is and setting out the steps the local authority require to remedy the breach).
- Planning Enforcement Order (when a person has deliberately concealed unauthorised development, a planning enforcement order enables action to be taken notwithstanding the fact that the time limit may have expired).
- Stop Notice (prohibiting activities in a related enforcement notice).
- Temporary Stop Notice (requiring that an activity which is a breach of planning control should stop immediately).
- Breach of Condition Notice.
- Injunction.
For more information see Planning Practice Guidance, Planning enforcement – overview.
It is illegal to disobey an enforcement notice (unless it is successfully appealed) and failure to comply can result in prosecution.
Building owners may appeal to the Planning Inspectorate against an enforcement notice on specific grounds as long as the appeal is received by the Planning Inspectorate before the ‘effective date’ on the notice. See Planning Portal Enforcement appeals for more information.
However, it is important to note that enforcement action is discretionary and so it may be more productive to seek early engagement with the local authority and to attempt to negotiate an agreement before an enforcement notice is served, rather than appealing.
[edit] Related articles on Designing Buildings
- Avoiding planning permission pitfalls.
- Development management.
- Enforcement activity.
- Enforcement notice.
- How long does it take to get planning permission.
- How long does planning permission last.
- Listed buildings.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning obligations.
- Planning permission.
- Retrospective planning application.
- Stop notice.
- Temporary stop notice.
[edit] External references
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.