Retrospective planning permission
Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
It is possible to apply for retrospective planning permission after works have begun. The local planning authority will then consider the application in the same way that they would any other application. Retrospective permission may be granted, however, there is a very serious risk that permission will not be granted and then enforcement action may be taken. This could include modifying completed works, or returning the development to its previous ‘permitted’ state. Appeals can be made to the planning inspectorate.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest. One possible enforcement action is to ask the party in breach to make a retrospective planning application if they have not already done so. However, permission may still then be refused.
On 6 April 2012, the Localism Act 2011 made changes to planning enforcement to tackle abuse of retrospective planning applications:
- Planning authorities can decline to determine retrospective applications after an enforcement notice has been issued.
- Limits have been introduced to the right of appeal against an enforcement notice after a retrospective planning application has been submitted, but before the time for making a decision has expired.
- Limiting appeals on technical grounds resulting in the granting of planning consent.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Avoiding planning permission pitfalls.
- Listed buildings.
- Localism Act.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning enforcement.
- Planning obligations.
- Planning permission.
- Regularisation.
[edit] External references.
- House of Commons Library, Enforcement of Planning Law. 16 July 2013.
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.