Regularisation
Regularisation refers to the process of certifying building works that have been carried out without Building Regulations approval. The regularisation process enables people to submit a retrospective application relating to the previously unauthorised works.
Regularisation applications can be made for both domestic and non-domestic works which were started on or after 11 November 1985. Before this date, any work that has been completed is not covered by the procedure.
The local authority’s building control service should be consulted to discuss the particular circumstances of the works prior to a regularisation application being submitted.
Inspections may need to be carried out to determine whether or not the work complies with the building regulations, which may involve opening up the works, carrying out tests, sampling materials, and so on. The application form should be submitted along with a plan of the works done, the layout prior to the works being done, and, if required, plans or details of how to bring the works up to current standards.
When steps have been taken to ensure the building complies with current standards, or if no such work is required, then a regularisation certificate will be issued.
While applying for a regularisation certificate is not a legal requirement, complying with the building regulations is, and failure to comply may cause problems for the owner when they try and pass on ownership.
Manual to the Building Regulations, A code of practice for use in England, published by the Ministry of Housing, Communities and Local Government (MHCLG) in July 2020, states: ‘Regularisation certificates can be issued by local authorities retrospectively to indicate that work started after 11 November 1985 which has been completed complies with the Building Regulations which applied at the time the works were done.’
[edit] Related articles on Designing Buildings
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.