Maintenance tips for extending AHU lifespans
Contents |
[edit] Introduction
Air-Handling Units (AHUs) are the unsung heroes of indoor air quality and comfort, tirelessly working to ensure that the air we breathe is clean and conducive to a healthy environment. These vital components of HVAC systems play a critical role, and it's only natural that we strive to maximise their lifespan. Regular maintenance isn't just about preventing breakdowns; it's about extending the life of AHUs, optimising their performance, and reaping significant cost savings. In this article, we'll explore valuable maintenance tips that can help you achieve just that.
[edit] The Importance of AHU Maintenance
An AHU's lifespan is heavily influenced by the care it receives. Neglected AHUs are prone to wear, reduced efficiency, and even premature failure. Proper maintenance, on the other hand, not only ensures longevity but also delivers several benefits:
- Cost Savings: Regular maintenance minimises the need for major repairs and replacements, translating to substantial cost savings over the AHU's lifespan.
- Energy Efficiency: A well-maintained AHU operates more efficiently, consuming less energy to achieve the desired air quality and temperature. This contributes to lower energy bills and a reduced carbon footprint.
- Enhanced Performance: Properly maintained AHUs consistently deliver the performance they were designed for, providing consistent air quality and temperature control.
- Indoor Air Quality: Regular maintenance keeps filters and components clean, leading to improved indoor air quality and a healthier environment for occupants.
[edit] Maintenance Tips for AHU Longevity
- Regular Inspections: Schedule routine visual inspections to identify signs of wear, corrosion, leaks, or any visible issues that might compromise performance.
- Cleaning and Filter Replacement: Clean or replace filters on a regular basis to prevent the build-up of dirt and contaminants that can impede airflow and strain the system.
- Lubrication: Keep bearings, motors, and moving parts well-lubricated as per manufacturer guidelines to prevent friction and extend component life.
- Condensate Drain Maintenance: Regularly inspect and clean condensate drain lines to prevent blockages that could lead to water damage or mould growth.
- Belt and Pulley Maintenance: Check and adjust belts and pulleys as needed to maintain proper tension and prevent wear.
- Electrical Components: Inspect and tighten electrical connections, replace damaged wiring, and ensure all electrical components are functioning as intended.
- Fan and Motor Maintenance: Clean fan blades, inspect for balance issues, and ensure motors are running smoothly.
- Coil Cleaning**: Regularly clean evaporator and condenser coils to optimise heat transfer efficiency.
- Seal and Gasket Inspection: Check seals and gaskets for signs of wear, ensuring that there are no air leaks that can compromise efficiency.
- Professional Maintenance: While some maintenance tasks can be done in-house, regular professional maintenance is essential. Trained technicians can identify and address potential issues before they escalate.
[edit] Conclusion
An AHU's lifespan is a direct result of the care it receives. Regular maintenance isn't just an expense; it's an investment in the longevity, efficiency, and performance of the system. By adhering to a comprehensive maintenance plan that includes regular inspections, cleaning, lubrication, and professional service, you can extend the life of your AHUs, reduce operational costs, and provide a healthier indoor environment for all. Remember, when AHUs work optimally, they ensure not only comfort but also long-term savings and peace of mind.
--Building Ventilation Solutions
[edit] Related articles on Designing Buildings
- Air conditioning.
- Air conditioning inspection.
- Chiller unit.
- Chilled water.
- CIBSE Case Study London Olympic Aquatics Centre.
- Cooling systems for buildings.
- Cooling tower design and construction.
- Constant air volume.
- Ductwork.
- Evaporative cooling.
- Face velocity.
- Fan coil unit.
- Heating.
- Heat load
- How to Use Your Air Conditioning Energy Assessments to Reduce Energy Costs.
- HVAC.
- Mechanical ventilation.
- Natural ventilation.
- Tempering heating.
- Thermal comfort.
- Underfloor air distribution.
- Variable air volume VAV.
- Variable refrigerant flow VRF.
- Ventilation.
Featured articles and news
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.