Click and lock flooring
Contents |
[edit] Introduction
The term ‘flooring’ refers to the lower enclosing surface of spaces within buildings. This may be part of the floor structure, such as the upper surface of a concrete slab or floor boards, but typically it is a permanent covering laid over the floor. There are many types of flooring materials available.
Click and lock flooring (also known as snap and lock flooring, lock flooring, drop and lock flooring, snap lock flooring or click together flooring) is a type of flooring that is primarily used on floating floors over subfloors. As a type of floating floor, click and lock floors are not fixed to the substrate layer below (which may be, for example, the structural floor, an underlay, an underfloor heating construction or acoustic or thermal insulation).
Floating floors are held in place by a combination of their own weight, the boundaries of the room in which they are laid, the fixings between the elements of the floating floor, and friction between the floating floor and the substrate. Floating floors are particularly common in refurbishment works, and can be used to help improve the thermal or acoustic insulation of a floor construction.
[edit] Fitting the boards together
Click and lock flooring can be manufactured in boards or planks of varying lengths and widths. It is most commonly produced in engineered wood, laminate and other materials such as cork, vinyl and engineered bamboo. Historically, it has not generally been used for solid hardwood flooring, although this is now becoming more widely available.
Engineered flooring typically consists of boards made up of three or four layers of laminated timber, held together at right angles by glue to create a plank typically of around 14mm thickness. Laminate flooring is a compressed fibreboard plank covered with an image of a material such as timber, stone, tiles and so on that is then given a protective coating.
These planks have specially milled tongue and groove (T&G) treatments on each edge. Angled tongue (male) projections are formed onto one edge of a board while a matching angled groove (female) recession is cut on the other edge. The tongue of one board fits into the groove of the adjoining board to form a strong, flush joint.
Tongue and groove joints are variations on the mortise and tenon joint, but instead of joining two pieces at a right angle (like a mortise and tenon joint), the tongue and groove connection creates a strong parallel joint. However, unlike basic tongue and groove flooring, click lock flooring joins at the interlocking edge and then gets snapped into place through the application of firm, downward pressure.
[edit] Installation
As click and lock products do not require glue or nails, they are popular options for do-it-yourself flooring installation. It is generally a fairly quick process that does not necessarily require a professional contractor.
An important part of the installation process is the preparation of the flooring surface. While it may or may not be necessary to remove old flooring, a suitable underlay should always be used. For noise reduction, it is advisable to use high quality underlay materials under click and lock flooring.
Since this installation method creates a floating surface, it is possible to put one floor on top of another, with underlay in between, as long as the surface is clean, flat and dry, and the subfloor is solid and jointless. It is not suitable for uneven wood floors or carpet.
Under the right conditions, a click and lock floor may be installed over the following surfaces:
- Concrete slab.
- Cork.
- Hardwood.
- Linoleum.
- Natural stone (if smooth).
- Oriented Strand Board (OSB) or particleboard.
- Plywood.
- Porcelain tile.
- Vinyl tiles, sheets or planks.
Before installation, materials should be given time to acclimatise to their environment. The unopened boxes can sit for 48 hours or more at normal room temperature to give them time to adjust. If the boards have not been given enough time to acclimatise, boards can buckle or gaps can develop. This problem can be resolved with a device called a floor gap fixer after the installation is complete, but it is advisable to take suitable precautions beforehand.
Next, it may be beneficial to arrange the materials on the floor in a mock up before installing them. While the click and lock method isn’t permanent, this planning step helps to anticipate cuts and adjustments created by the shape of the room or difficult areas around doors.
It is important to leave slight gaps between the floor and the wall for expansion once the boards are locked in place. This can be covered later with a profiled edge trim, or filled with a flexible filler.
[edit] Underfloor heating
Certain types of click and lock flooring (such as those suitable for transferring heat) can be installed over underfloor heating (UFH). Options include engineered flooring, bamboo and laminate.
UFH is a form of heating in which the floor surface of a space is heated and this heat is then radiated (and convected) throughout the space to create comfortable thermal conditions.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.