Move log
- 17:32, 30 January 2015 Designing Buildings (Talk | contribs) moved Site information for building design and construction to Site information for design and construction
- 16:52, 30 January 2015 Designing Buildings (Talk | contribs) moved Options appraisals for building design and construction to Options appraisals for construction projects
- 16:46, 30 January 2015 Designing Buildings (Talk | contribs) moved Talk:Strategic brief for building design to Talk:Strategic brief for construction projects
- 16:46, 30 January 2015 Designing Buildings (Talk | contribs) moved Strategic brief for building design to Strategic brief for construction projects
- 16:26, 30 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: strategic brief to BIM plan: prepare a strategic brief
- 10:18, 30 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: operation and in use to BIM plan: in use
- 10:15, 30 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: build and commission to BIM plan: construction
- 14:15, 29 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: feasibility studies to BIM plan: appraisals
- 12:33, 29 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: detailed design to BIM plan: developed design
- 15:17, 23 January 2015 Designing Buildings (Talk | contribs) moved Bottom-up approach to address the challenges of Low Carbon Eco-Cites to Bottom-up approach to address the challenges of low-carbon eco-cites
- 14:29, 23 January 2015 Designing Buildings (Talk | contribs) moved CIBSE Case Study: Holding out for Zero to CIBSE Case Study: Walgreens net zero energy drugstore
- 10:29, 22 January 2015 Designing Buildings (Talk | contribs) moved Standard method and procedure to Standard method and procedure SMP for BIM
- 08:36, 21 January 2015 Designing Buildings (Talk | contribs) moved Construction Industry Training Board to Construction Industry Training Board CITB
- 12:39, 19 January 2015 Designing Buildings (Talk | contribs) moved Client BIM adviser to Employer's BIM adviser
- 16:25, 16 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: prepare documentation to BIM plan: preparation and brief [redirect suppressed]
- 14:23, 13 January 2015 Designing Buildings (Talk | contribs) moved Organisational information requirements to Organisational information requirements OIR
- 08:57, 13 January 2015 Designing Buildings (Talk | contribs) moved Enabling works for consturction to Enabling works for construction
- 16:30, 7 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: preparing documentation to BIM plan: prepare documentation
- 15:47, 7 January 2015 Designing Buildings (Talk | contribs) moved BIM plan: project plan to BIM plan: outline plan
- 08:30, 7 January 2015 Designing Buildings (Talk | contribs) moved BIM: project plan to BIM plan: project plan [redirect suppressed]
- 08:01, 22 December 2014 Designing Buildings (Talk | contribs) moved Thermal mass to Thermal mass in buildings
- 08:00, 22 December 2014 Designing Buildings (Talk | contribs) moved Allowable solutions to Allowable solutions for zero carbon buildings
- 07:59, 22 December 2014 Designing Buildings (Talk | contribs) moved Access consultant to Access consultant for building design and construction
- 07:57, 22 December 2014 Designing Buildings (Talk | contribs) moved Ecologist to Ecologist for building design and construction
- 07:57, 22 December 2014 Designing Buildings (Talk | contribs) moved Welfare facilities to Welfare facilities on construction sites
- 07:56, 22 December 2014 Designing Buildings (Talk | contribs) moved Repudiatory beach to Repudiatory beach in construction contracts
- 07:54, 22 December 2014 Designing Buildings (Talk | contribs) moved Malaysia to Construction in Malaysia
- 07:53, 22 December 2014 Designing Buildings (Talk | contribs) moved Specific performance to Specific performance in construction contracts
- 07:56, 18 December 2014 Designing Buildings (Talk | contribs) moved Equipment to Equipment in buildings
- 07:54, 18 December 2014 Designing Buildings (Talk | contribs) moved Fitting to Fittings in buildings
- 07:53, 18 December 2014 Designing Buildings (Talk | contribs) moved Thermal indices to Thermal indices for the built environment
- 07:50, 18 December 2014 Designing Buildings (Talk | contribs) moved Mechanical ventilation to Mechanical ventilation of buildings
- 07:49, 18 December 2014 Designing Buildings (Talk | contribs) moved Design methodology to Design methodology for building projects
- 07:49, 18 December 2014 Designing Buildings (Talk | contribs) moved Talk:Productivity to Talk:Productivity in building desing and construction
- 07:49, 18 December 2014 Designing Buildings (Talk | contribs) moved Productivity to Productivity in building desing and construction
- 07:48, 18 December 2014 Designing Buildings (Talk | contribs) moved Gateway to Gateways in building design and construction projects
- 14:46, 15 December 2014 Designing Buildings (Talk | contribs) moved Why Use Phenolic Foam for Floor Insulation? to Phenolic foam insulation
- 10:52, 15 December 2014 Designing Buildings (Talk | contribs) moved Modular Solutions to Place Planning Issues to Modular buildings for education
- 10:14, 15 December 2014 Designing Buildings (Talk | contribs) moved Pushing the Boundaries of Off-site Construction in the Healthcare Sector to Off-site construction in the healthcare sector
- 10:10, 15 December 2014 Designing Buildings (Talk | contribs) moved The Myths of Modular Construction to The myths of modular construction
- 08:10, 15 December 2014 Designing Buildings (Talk | contribs) moved Overage to Overage in property sales
- 08:09, 15 December 2014 Designing Buildings (Talk | contribs) moved Archaeology to Archaeology in the built environment
- 08:08, 15 December 2014 Designing Buildings (Talk | contribs) moved Photography to Photographing buildings
- 08:07, 15 December 2014 Designing Buildings (Talk | contribs) moved Sui generis to Sui generis use class in planning
- 08:06, 15 December 2014 Designing Buildings (Talk | contribs) moved Project engineer to Project engineer for construction
- 08:05, 15 December 2014 Designing Buildings (Talk | contribs) moved Natural ventilation to Natural ventilation of buildings
- 09:45, 5 December 2014 Designing Buildings (Talk | contribs) moved Air conditioning inspections to Air conditioning inspection [redirect suppressed]
- 16:44, 2 December 2014 Designing Buildings (Talk | contribs) moved Tree Hazard Survey to Tree hazard survey
- 16:40, 1 December 2014 Designing Buildings (Talk | contribs) moved CIBSE Case Study On Course to CIBSE Case Study Derby Council House
- 08:02, 28 November 2014 Designing Buildings (Talk | contribs) moved Thermal zones to Thermal zones in building design
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















