Equipment installed in buildings
The article relates to equipment installed in buildings. For equipment used in construction works, see: Equipment used to construct buildings.
It is important to identify equipment that will be provided within the main contract and equipment which, whilst it may be provided outside of the main contract (because the client may already have the equipment, or they may have existing suppliers) might have an impact on the main contract (perhaps needing to be accommodated in a certain location, or requiring fixing, power supply, air supply, water, drainage, telecommunications connection, etc.).
Equipment requirements might include:
- Built in equipment requiring mechanical or electrical connections such as fume cupboards or drinks stations. A description of built in equipment should include; location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Built in equipment that does not require services such as cupboards or shelving. These should be described in terms of their location and size.
- Stand alone loose furniture and equipment requiring services, such as washing machines, coffee machines and scanning equipment in hospitals. These should be described in terms of their location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Stand alone loose furniture and equipment not requiring services such as tables and chairs. These should be described in terms of their location and size.
[edit] Related articles on Designing Buildings Wiki
- Chattels.
- Commissioning.
- Compressed air plant.
- Concreting plant.
- Construction plant.
- Construction tools.
- Crane regulations.
- Debris netting.
- Earth-moving plant.
- Excavating plant.
- Fittings.
- Fixtures.
- Industrial plant and construction operations.
- Packaging.
- Plant room.
- Power float.
- Procurement route.
- Room data sheet.
- Sanitaryware.
- Specification.
- Tender.
- Tender documents.
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.