Y:Cube
The first Y:Cube was an affordable housing unit designed by Rogers Stirk Harbour + Partners (RSHP) at 200 The Broadway, Wimbledon, London.
RSHP and SIG (a supplier of specialist construction products) worked with the YMCA London South West to develop an economic and innovative housing solution, providing self-contained and affordable starter accommodation for young people unable to gain a first step on the housing ladder or pay the high costs of private rent.
The Y:Cube units are 26m2 one-bed studios for single occupancy that arrive on site as self-contained units. Each one is constructed in the factory with building services already incorporated. Water, heating and electricity can be easily connected to existing facilities or to other Y:Cubes already on site. This ‘plug and play’ approach results in a modular, demountable system of apartments that are perfectly designed for brownfield sites. Additional units can be added if needed and whole developments can be taken apart and rebuilt in new locations. This modern method of construction makes for a neighbourly, clean and quiet site.
Each unit is constructed from high quality, environmentally-efficient materials (primarily renewable timber) and can achieve a level 6 Code for Sustainable Homes rating. The factory conditions in which the pods are assembled ensures tolerances of 2mm, creating accommodation that is well insulated and requires little or no heating, even in winter months. The rent is set at 65% below the market rate.
Every resident is either referred by the London Borough of Merton or a previous resident of the YMCA. The Y:Cube provides an alternative to poor-quality, shared accommodation managed by private landlords and can offer a better solution for those in housing need within the community.
Y:Cube Housing offers a real opportunity for social investment, providing a solid return to investors whilst at the same time meeting a huge need.
Richard Blakeway, Deputy Mayor of Housing said, “Y:Cube is a fantastic example of the innovative housing projects we support to address a range of housing demands. We need bold ideas to stimulate growth and address the historic failure to build enough homes and modular construction has an important role.”
- Place: London, UK
- Date: 2013 - ongoing
- Cost: £1.6 million (for a 36-unit development)
- Area: 1640 m²
- Client: YMCA
- Architect: Rogers Stirk Harbour + Partners
- Services Engineer: PBA
- Landscape Architect: Landform
- Manufacturer: Insulshell
Watch a time lapse video of the Y-Cube construction process on Vimeo.
A 36-unit Y:Cube development was created in Mitcham in 2015. See Y:Cube development in Mitcham for more information.
At the beginning of 2016, 7 further Y:Cube schemes, were proposed, including sites in Essex, south-west London and on the south coast of England, ranging in size from 15 to 36 apartments. Ref Construction Manager Magazine, 19 January 2015.
[edit] Related articles on Designing Buildings Wiki
- BRE Üserhuus.
- British post-war mass housing.
- Container City.
- McArthurGlen Designer Outlet Ashford.
- Modular buildings.
- Off-site prefabrication of buildings: A guide to connection choices.
- Open source architectural plans for modular buildings.
- Plug-In to Housing.
- Prefabrication.
- Skyfarm.
- WikiHouse.
- Y:Cube development in Mitcham.
[edit] External references
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























