Modular construction is quickly becoming the a popular method of construction in the UK. It is a fast, cost-effective and efficient method of development that is revolutionising the way that the world builds. Here we discuss the construction problems that can be avoided by using a modular approach.
[edit] Build time
Traditional on-site construction follows a linear construction method, meaning every step needs to be completed before the next one can begin. All construction is carried out onsite and can be affected by several factors, including the weather and labour inefficiencies. With so many elements to coordinate, an issue with just one part can affect the entire build schedule. As a result, traditional construction projects regularly overrun.
For example, concrete is a stable material in the construction industry. It’s sturdy and durable, but it is also a time-consuming material. Concrete structures can take months to develop due to custom engineering. Preparation for the concrete construction then needs to be carried out, materials procured, and specialised labourers and appropriate machinery sourced. The approval and preparation process alone can take months.
Modular building projects use prefabricated elements that are assembled in a factory and transported to the site entirely or mostly complete. Allowing critical aspects of a build to run concurrently. While modular buildings are being constructed away from the site, foundation work can be carried out at the same time. The resulting building can be completed up to 50% quicker.
[edit] Impact on business
Carrying out construction work on the site of your business can cause significant disruption to day-to-day running and can potentially result in a loss of income. Building off-site, 80% of the construction activity is done away from the business location, and the modular buildings are transported to the site flat-packed and ready to build. Meaning there is far less disruption and noise - significantly reducing the impact physically and financially.
[edit] Eco-friendly materials
Traditional building materials and methods are in general not eco-friendly. Concrete is not an environmentally friendly material, either to make, or to use, or even to dispose of. Paints used often contain damaging hydrocarbons and solvents, and plastics and composite timbers are also commonplace.
Modular constructions can be kinder to the environment using eco-friendly and recycled building materials. Modular buildings are made to specification and approached with eco-friendly, sustainable design at the core.
[edit] Energy efficient
Modular buildings can be very efficient in comparison to traditional constructions. Modular constructions can exceed the standard building regulations requirements by enhanced insulation. The materials used for internal walls improve sound insulation and fire-proofing, and the building structures are extremely airtight which ensures their energy-efficiency.
[edit] Less waste
Research carried out by WRAP has stated that off-site construction can reduce on-site waste by up to 90%. Modular buildings are constructed within a factory, and away from site meaning, the amount of waste that is produced can be significantly reduced as modules are built directly to spec using Computer Aided Manufacturing. The modular approach also reduces the project’s carbon footprint.
[edit] Improved health and safety
The need to work at height can be eliminated as the main part of a modular structure is constructed off-site within a controlled factory environment following strict procedures which have been proven to improve safety.
[edit] About this article
This article was written by MTX Contracts, a UK-based construction specialist delivering bespoke modular building solutions and turnkey fit-outs for the healthcare and education sectors.
[edit] Related articles on Designing Buildings Wiki
- Design for deconstruction.
- Design for deconstruction, BRE modular show house.
- Design for Manufacture and Assembly (DfMA).
- Futuro House.
- Kit house.
- Modern methods of construction.
- Modular buildings in the educational sector.
- Modular classrooms: The Friars Primary School extension
- Off-site construction.
- Off site, on track.
- Off-site prefabrication of buildings: A guide to connection choices.
- Open source architectural plans for modular buildings.
- Plug and play skyscrapers.
- Prefabricated structural panels.
- Prefabrication.
- Self build home.
- Structure relocation.
- Student accommodation.
- Types of building.
- WikiHouse.
- Y:Cube.
- Y:Cube development in Mitcham.
Featured articles and news
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Thanks, if you want to write a separate related article rather than a comment, it is free to do so, just search Create a new article. Please do list any source references. Thanks.