Switch House, Tate Modern
Contents |
[edit] About the Switch House
In June 2016, Designing Buildings Wiki attended a preview of the new extension of the Tate Modern, located on the south bank of London’s Thames. The Switch House opened 16 years after the former Bankside Power Station was reopened to become the world’s most popular museum of modern and contemporary art.
Designed by internationally-renowned architects Herzog & de Meuron, the extension adds 60% more space to be used for live art, installations and film. It has been touted as Britain’s most important new cultural building for almost two decades.
The cylindrical underground Tanks, each of which measures more than 30 m across, serve as the foundations of the 10-storey Switch House building, which is a sharp-angled pyramid-like structure with the power station’s brickwork reinterpreted in a perforated lattice cladding of 336,000 bricks.
Window openings in the façade progress from thin and vertical to long and horizontal as their height increases, allowing light to filter in during the day and ot glow outwards during the evening.
The interior is formed almost entirely using exposed concrete, with sweeping staircases and unusual angles that provide an impression of spaciousness without appearing cavernous.
A public terrace on the 10th floor offers 360-degree panoramic views of London, and a new bridge spanning the Turbine Hall joins the existing galleries in the Boiler House with the new galleries in the Switch House.
Sustainability is at the heart of the design, with a high thermal mass, natural ventilation, solar panels and newly-created green spaces.
At the launch, the new Mayor of London Sadiq Khan, described the Tate as “a modern museum for the 21st century”. He said that for too long culture had been a ‘nice to have’ and that it would now be at the core of his administration. He touched on plans to introduce Creative Enterprise Zones where creative artists can live and work affordably instead of being priced out of the city.
Perhaps hinting at the upcoming EU referendum, Culture Minister Ed Vaizey, said the museum and its global collection served as a statement about a “confident Britain that looks out on the world”.
[edit] Controversy
Since its completion, the Switch House viewing platform has been mired in some controversy as occupants of the neighbouring Neo Bankside have complained about their loss of privacy.
In April 2017, residents of the RSHP-designed Neo Bankside began a legal bid trying to force the shutting down of part of the viewing platform. Five residents lodged papers at the High Court seeking an injunction. They claim that the Tate Modern is in breach of their human rights due to 'near constant surveillance' from visitors on the platform who are able to look directly into their apartments.
The papers claim that, 'the defendants’ use of … part of its viewing platform is unreasonably interfering with the claimants’ enjoyment of their flats, so as to be a nuisance', and say that the visual intrusion '...does not provide a safe or satisfactory home environment for young children.'
The claim highlights the fact that visitors often use binoculars and take photographs and footage of their homes, before posting them on social media.
Residents have called for the terrace to be cordoned off, or for a screen to be built at their expense along the viewing platform. However, the Tate Modern, while putting up notices asking visitors to 'respect the privacy' of their neighbours, were not willing to restrict access to the platform.
Neo Bankside won planning permission in June 2007 and the scheme started on site two years later and finished in 2012.
The original Tate Modern extension was permitted in December 2008 and included a rooftop terrace in its plans. A revised proposal including a brick façade and the viewing gallery was permitted in May 2009 as work began on the adjacent Neo Bankside. It is understood that no objections were raised to the proposed terrace at the time.
For more information, see Tate Modern.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.