The Gross Heat of Combustion is also known as the Higher Heating Value (HHV) or Gross Calorific Value (GCV), and is the total amount of heat released when an object (often a fuel) is completely burned, with all water vapour produced from the combustion condensing into liquid water and represents the maximum potential energy that can be extracted.
The Gross Heat of Combustion (and HHV or GCV) is measured using a bomb calorimeter, which is a sealed insulated container (bomb) with excess oxygen under pressure, with a water bath, in which a known mass of fuel is burned. The heat released during combustion is absorbed by the water in the bath surrounding the bomb, which causes a measurable temperature increase using the calorimeter's constant (measure of its heat capacity) and the temperature change of the water.
Other related terms include Lower Heating Value (LHV) and Net Calorific Value (NCV), these differ from HHV and GCV which account for the energy released when the water vapour is condensed back into liquid, while LHV/NCV calculations do not.
This is one of the test approaches to material analysis that is included in the University of Queensland, Australia's Cladding Materials Library. The library lists some 81 materials and product make-ups that constitute potential cladding solutions for buildings, that have been analysed and or tested. The Cladding Materials Library from Queensland was mentioned in the Grenfell Tower Inquiry Phase 2 report of the public inquiry into the fire at Grenfell tower on 14 June 2017: Part 14 Recommendations in the section A construction library 113.39:
“Those who design buildings, particularly higher-risk and complex buildings, would benefit from having access to a body of information, such as data from tests on products and materials, reports on serious fires and academic papers. In Chapter 112 we have referred to the Cladding Materials Library set up by the University of Queensland, which could form the basis of a valuable source of information for designers of buildings in general. We recommend that the construction regulator sponsor the development of a similar library, perhaps as part of a joint project with the University of Queensland, to provide a continuing resource for designers.”
[edit] Related articles on Designing Buildings
- ACM cladding.
- ACM cladding testing by BRE.
- Approved Document B.
- BS 8414 Fire performance of external cladding systems.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- BS 9991:2015 Fire safety in the design, management and use of residential buildings. Code of practice.
- BS EN 13501-1.
- Building regulations.
- Building safety agreement with developers.
- Calorific value.
- Celotex RS5000 PIR insulation.
- Cladding for buildings.
- Composite cladding.
- Construction Products Regulation CPR.
- Construction Products Reform Green Paper and Consultation.
- Digital Product Passports DPP.
- Ecodesign compliant products.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135)
- Fire safety design.
- Grenfell Tower articles.
- Grenfell Tower fire.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower Inquiry.
- Heating value.
- HPL cladding.
- Independent review of the building regulations and fire safety.
- Lakanal House fire.
- Material of limited combustibility.
- Non-ACM cladding.
- Protecting tenants and leaseholders from unsafe cladding.
- Rainscreen cladding.
- Reform of building safety standards.
- Ronan Point gas explosion.
- Thermogravimetric analysis TGA.
- Torre Windsor office building fire.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.