Pontoon bridge
|
| The Evergreen Point Floating Bridge in Washington State, carrying State Route 520 over Lake Washington, seen from the north side bicycle and pedestrian trail from the west high rise. It is the world's longest pontoon bridge. |
Contents |
[edit] Introduction
Bridges are a common feature of the built environment and one of the key elements of civil engineering. Movable bridges are designed in a way that allows them to accommodate different situations and the flow of different types of traffic. One kind of movable bridge is a pontoon (or ponton) bridge. These are also referred to as floating bridges.
[edit] How do pontoon bridges work?
Pontoon bridges are constructed on large, water-tight concrete floats, boats, barges or other buoyant structures that are rigidly connected end-to-end, upon which the road deck is constructed. Individual bridge pontoons are built on the land before being floated and towed to the bridge site. Once there, they are connected at each end to grounded approach structures, starting at the edge of the floating structure and then pieced together towards the bridge’s centre. Cables hold the pontoons in place, connected to buried anchors.
The use of floating bridges is typically limited by the wind and wave forces that are likely to be experienced. The ‘fetch’ is the unobstructed clear distance over the water that wind can travel to the bridge. The longer the fetch, the higher the wind and wave forces will generally be. Pontoons bend, heave and twist as a result of wind and wave (and sometimes tidal) forces, creating large stresses in the pontoons and anchor system. However, even in the event of a ‘100-year storm’ (a storm that statistically has 1% chance of occurring in any given year), the pontoons are designed to survive.
Due to the movement associated with a pontoon bridge, they often require more maintenance than traditional structures, even under normal operating conditions.
[edit] Strategic pontoon bridges
The earliest recorded use of a pontoon bridge goes back to Ancient China. While texts indicate use by the Zhou Dynasty in the 11th century BC, it is believed that temporary pontoon bridges were used several centuries earlier and permanent pontoon bridges came about in the 2nd century BC during the Qin Dynasty.
Temporary pontoon bridges were frequently used in Ancient Greek and Roman times. This continued in the middle ages, when they were frequently used in military applications.
As tactical structures, they were used during emergency situations, such as natural disasters or wartime conflicts. They were put in place either when conventional bridge construction was thought to be cost prohibitive or when additional flexibility (such as elevation or removal for the passing of waterway traffic) was necessary.
Temporary pontoon bridges could be built quickly and then either destroyed or removed and carried along with troops. Their flexibility prevented enemy forces from using the structures.
[edit] Permanent pontoon bridges
There are some permanent pontoon bridges in use around the world in places such as Australia, India, Canada and so on. As permanent structures, pontoon bridges generally require deep water and are practical in places where the softness of the ground beneath the bridge makes it unsuitable for safe pier construction.
In March 2016, Washington State in northwest America opened the world’s longest floating bridge. The ‘State Route 520 Bridge’ (SR520), as it is known, is a six-lane pontoon structure 2.4 km in length. There are three additional pontoon bridges in Washington State.
[edit] Related articles on Designing Buildings
- Amphibious Construction.
- Bascule bridge.
- Bridge construction.
- Bridges of the world.
- Bridge structures.
- Dredging.
- General Hugh Debbieg military engineer and surveyor.
- Maunsell forts.
- Movable bridge.
- Navigable aqueduct.
- Retractable bridge.
- River engineering.
- State Route 520 Floating Bridge.
- Submersible bridge.
- Swing bridge.
- Three pieces of infrastructure that have saved lives.
- Underwater foundations.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.