Ground heave
Contents |
[edit] Introduction
Ground heave is the upward movement of the ground usually associated with the expansion of clay soils which swell when wet. As the soil generally cannot expand downwards or sideways, the result is that the exposed upper surface of the soil rises up. The impact of heave is opposite to the effect of subsidence which is where soil is unstable and sinks downward, or settlement which is caused by the weight of a building.
Displacement is generally less than 150 mm, however, even this level of movement can lead to serious structural damage to building foundations and fabric. Long-term damage could be incurred that may not be detected for some time, but can significantly affect a property’s value.
[edit] Causes of ground heave
The most common cause of ground heave is associated with trees which have died or been removed. As the root network no longer draws water from the subsoil, water accumulates in the ground, resulting in swelling that can move building structures upwards.
Additional causes of ground heave may include:
- ‘Stress relief’ (or overburden recovery) attributable to soil being removed from an excavation and so relieving pressure on layers below. This may occur for example in the construction of basements.
- A change in the level of the water table.
- Broken drains or nearby building works that interfere with existing ground drainage.
- Swelling of the sub-soils due to seasonal weather changes.
- Water expanding as it freezes causing soil to swell. Some particular soils, such as silty and sandy clays, can be more susceptible than others.
[edit] Signs of ground heave
Common signs of ground heave may include:
- Cracking to brickwork and windows. This cracking is more likely to be vertical, whereas subsidence cracking is more likely to be diagonal.
- Doors sticking as their frames become out of square.
- Lifting of paths and patios surrounding buildings.
[edit] Prevention and remedying of ground heave
Surveys will indicate whether heave has occurred that may impact upon a building, and may advise, for example, on the potential risks of proposed works such removing trees near buildings. Investigations may include visual inspection, historic research and drilling boreholes to determine the moisture profile of the soil.
Where heave is likely to be a problem, cellular structures may be installed beneath foundations and floor slabs to reduce the upward force of heave from transmitting to the structure above. For more information, see Cellular raft foundation.
Remedying damage due to ground heave can be a lengthy and expensive process. Where heave is the result of an underlying problem, remedial works such as repairing leaking drains or removing vegetation may resolve the problem.
Where the soil itself is prone to heave, underpinning may be necessary to stabilise structures. Excavated soil from beneath existing foundations is replaced with material, usually concrete, in a series of phases to form a new foundation beneath the existing one, reaching down to subsoils that are not prone to heave. It may be necessary to leave a cavity beneath the structure to accommodate future movement of the upper layers of soil.
[edit] Related articles on Designing Buildings Wiki
- Brownfield land.
- Cellular raft foundation.
- Contaminated land.
- Cracking and building movement.
- Defects in brickwork.
- Defects in construction.
- Defects in stonework.
- Driven piles.
- Foundations.
- Ground anchor.
- Ground conditions.
- Ground improvement techniques.
- Groundworks.
- Latent defects.
- Lateral loads.
- Remedial works.
- Settlement.
- Sinkholes.
- Subsoil.
- Tree rights.
- Tree root subsidence.
- Underpinning.
- Uplift force.
- Why do buildings crack? (DG 361).
[edit] External references
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”

























Comments
Can anyone inform as to how many years heave will last?