BREEAM Water leak detection
Contents |
[edit] Aim and benefits
The aim of this issue is to reduce the consumption of potable water in new buildings through minimising wastage due to water leaks. Water leaks in building systems can cause major damage to property. Early detection can help minimise damage, costs and disruption arising from water leaks.
[edit] When to consider
This issue is not RIBA stage dependent.
[edit] Step by step guidance
This BREEAM issue is split into two parts:
[edit] Leak detection
The BREEAM requirement is a leak detection system capable of detecting a major water leak:
On the utilities water supply within the buildings, to detect any major leaks within the buildings AND
Between the buildings and the utilities water supply, to detect any major leaks between the utilities supply and the buildings under assessment.
Typically a BREEAM compliant leak detection system will comprise a controller and two pulsed water meters, one to be located in the plant room/mains water area and the other on the boundary of the building after the utilities water meter. The controller is programmed to monitor maximum water flow levels allowed during certain time periods. If this maximum is exceeded, the controller will notify the building facilities manager/nominated personnel that there is a possible leak for them to manually switch off the water supply and investigate the problem. Some controllers activate an automatic valve and shut off the supply.
[edit] Flow control devices
Flow control devices that regulate the water supply to each WC area or sanitary facility according to demand can help minimise undetected wastage and leaks from sanitary fittings and supply pipework.
Flow control devices are used to automatically control the flow of water into toilet areas, often using PIR (passive infrared) sensors connected to valves fitted on the main water supplies to the area. When someone enters the toilet, the PIR activates and the valves open allowing water to flow in. After the areas been vacated the valve automatically closes, switching the water off again. This ensures that water is only supplied when required, therefore preventing minor water leaks from accumulating into large amounts of waste water.
[edit] Questions to ask while seeking compliance
[edit] Leak detection
The assessor needs evidence that the specified system is either a permanent automated water leak detection system that alerts the building occupants to the leak OR has an inbuilt automated diagnostic procedure for detecting leaks.
- Can the compliant system alert the appropriate person to the leak so they are able to respond immediately? The assessor can judge if the aim of the issue is being met by a reliable, robust and fail-safe means of notification.
- Is it the intention that a BMS will be used for leak detection purposes? The team have to demonstrate that its integrated or add-on features will meet all the requirements for a leak detection system.
[edit] Flow control
The assessor needs evidence that the specified flow control devices account for the occupancy and function of each space.
- Will the flow control devices be used for individual facilities? Devices are not actually required for each individual fitting and may control one or more WC area, such as adjacent male and female toilets within a core. However, where a single device is used to control the supply to multiple areas, the design team should provide details of the strategy employed.
- Are the facilities going to be in constant use for a fixed period each day? If so, a time controller can be justified as an effective means of activating a flow control device.
[edit] Tips and best practice
Leak detection - the BREEAM criteria is only applied to pipework over which the owner/occupier has control. Where third party organisations (such as utility companies) place restrictions on the pipework that can be metered, the scope of works (and placement of a meter for the use of leak detection) will start immediately after this point.
Flow control - where facilities are in constant use for a fixed period each day, a time controller can be justified as an effective means of activating a flow control device.
The flow control criteria still applies smaller or low occupancy buildings which may only have a single WC. In these instances shut-off could be provided via the same switch that controls the lighting (whether proximity detection or a manual switch).
[edit] Typical evidence
[edit] Design stage
Relevant section/clauses of the building specification or contract
[edit] Post-construction stage
BREEAM Assessor’s site inspection report and photographic evidence
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- BREEAM UK NC 2018
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
[edit] Related articles on Designing Buildings
Featured articles and news
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.