[edit] What are U-values?
U-values (sometimes referred to as heat transfer coefficients or thermal transmittances) are a measure of how effective the elements of a building's fabric are as insulators. That is, the degree to which they prevent heat from transmitting between the inside and the outside of a building.
The lower the U-value of an element of a building's fabric, the more slowly heat is able to transmit through it, and so the better it performs as an insulator.
Very broadly, the better (i.e. lower) the U-value of a building's fabric, the less energy is required to maintain comfortable conditions inside the building. As energy prices increase, and there is greater awareness of sustainability, performance measures such as U-values have become more important, and building standards (such as the Building Regulations) have required that lower and lower U-values are achieved. This has required changes in the design of buildings, both in the use of materials (such as insulation), the make-up of the building elements (such as cavity walls and double glazing), and the overall make up of a building's fabric (for example, reducing the proportion of glazing).
[edit] What is the difference between a U-value and an R-values?
R-values, which measure thermal resistance rather than thermal transmission, are often described as being the reciprocal of U-values, however, R-values do not include surface heat transfers.
[edit] What are the U-values of commonly building components?
U-values are measured in watts per square metre per kelvin (W/(m²K)). For example, a double glazed window with a U-value of 2.8, means that for every degree difference in temperature between the inside and outside of the window, 2.8 watts will be transmitted every square metre.
A range of typical U-values are:
- Solid brick wall: 2 W/(m²K)
- Cavity wall with no insulation: 1.5 W/(m²K).
- Insulated wall: 0.18 W/(m²K).
- Single glazing: 4.8 to 5.8 W/(m²K).
- Double glazing: 1.2 to 3.7 W/(m²K) depending on type.
- Triple glazing below: 1 W/(m²K).
- Solid timber door: 3 W/(m²K).
It is important to distinguish between U-values for materials (such as glass), or assemblies (such as windows, which have frames, air gaps, and so on), or elements (such as walls, which may have complex constructions comprising a number of different components).
[edit] What are the maximum U-values allowed?
Part L of the Building Regulations (Conservation of fuel and power) now prevents certain forms of construction by setting limiting standards (i.e. maximum U-values) for building elements. See Limiting fabric parameters for more information.
It should be noted however that these are maximum permitted values, the specification for the notional domestic building referred to in Part L1A has considerably lower values, for example:
- External wall: 0.18 W/(m²K).
- Floor: 0.13 W/(m²K).
- Roofs: 0.13 W/(m²K).
- Windows, roof windows, glazed rooflights and glazed doors: 1.4 W/(m²K).
See Standard Assessment Procedure SAP for more information.
[edit] How are U-values calculated?
The U value of an element (in W/(m²K)) can be calculated from sum of the thermal resistances (R-values in m²K/W) of the layers that make up the element plus its inside and outside surface thermal resistances (Ri and Ro).
U-value = 1 / (ΣR + Ri + Ro)
Where the thermal resistance of the layers of the element R = the thickness of each layer / the thermal conductivity of that layer (its k-value or lambda value (λ) in W/(mK)).
This can become a complicated calculation when there are a large number of layers, ventilated or unventilated cavities are introduced, or the element is inclined. Manufacturers will generally provide U-values for products that they supply. There are also a number of U-value calculators available online.
Calculation methods for U-values appropriate for demonstrating compliance with the building regulations are based on standards developed by the European Committee for Standardisation (CEN) and the International Organisation for Standardisation (ISO) and published as British Standards.
Whilst U-values are still used in the Building Regulations to set limiting standards for the elements of a building's fabric, the overall thermal performance of buildings is now assessed using more complex modelling procedures.
For non-domestic buildings, the Simplified Building Energy Model (SBEM) developed by the BRE for the Department for Communities and Local Government, determines the energy performance of a proposed building by comparing its annual energy use with that of a comparable notional building.
For dwellings, energy performance is assessed using the Standard Assessment Procedure (SAP).
NB: Whilst U-values and methods of modelling the thermal performance of buildings are invaluable in setting standards and providing a means of comparing alternative solutions, they are simplifications of reality, and performance in use rarely matches that which was predicted. Poor workmanship can result in reduced thermal resistance, as can poor detailing and the presence of water in insulating materials. See Insulation specification and performance gap for more information.
[edit] Related articles on Designing Buildings
- Air tightness in buildings.
- Building performance.
- Cavity wall insulation.
- Conduction.
- Conventions for calculating linear thermal transmittance and temperature factors.
- Conventions for U-value calculations (BR443 2e 2019).
- Double glazing v triple glazing.
- Emissivity.
- Free U-value calculators.
- g-value.
- k-value.
- Heat loss.
- Heat transfer.
- Insulation.
- Limiting fabric parameters.
- R-value.
- Standard Assessment Procedure SAP.
- Thermal admittance.
- Thermal bridge.
- Thermal mass.
- Thermal resistance.
- U-value conventions in practice: Worked examples using BR 443.
- U-What?
- What do design professionals need to know about U-value calculation conventions?
[edit] External references
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.