The term ‘electrical Installation’, with regards to electrical systems in buildings, may be considered as a verb or as a noun.
[edit] Electrical installation as a verb
Considering it firstly as a verb, electrical installation describes the physical work involved in installing electrical systems into a building.
Electrical installation work in this respect comprises all relevant activities, usually but not always limited to:
- Preparation work – such as cutting of holes, provision of fixings and supports.
- Physical installation of electrical wiring systems onto and within the building structure.
- Testing or wiring systems (usually for insulation resistance and to check for any damage).
- Installation of electrical equipment and its connection.
- Testing of electrical wiring and equipment – normally for compliance with BS 7671 (IET Wiring Regulations) Part 6 requirements.
- Production and issue of test certification and other handover documentation such as operation and maintenance details.
- Making good of finishes, sealing of holes and penetrations and particularly the provision of passive fire stopping in relation to this.
Stages 1 and 2 are often referred to in the trade as first fix activities, and usually precede the work of other trades such as plaster boarding, plastering, drylining, etc.
Stages 3 to 7 are then referred to as second fix activities and follow the work of other trades - often when cables have been concealed within the fabric of a building.
It is for this reason that best practice should be to test some of the wiring, usually for insulation resistance, before the connection of any equipment.
Note - The complete act of installation as defined above will often fall under different contracted parties. It is vital to establish clear boundaries and contract responsibilities before work is undertaken, particularly in areas such as building works, making good and fire stopping.
[edit] Electrical installation as a noun
Electrical installation as a noun is defined in BS 7671 as: ‘An assembly of associated electrical equipment having co-ordinated characteristics to fulfil specific purposes.’
Note also that BS 7671 defines ‘Electrical equipment’ as: ‘Any item for such purposes as generation, conversion, transmission, distribution or utilisation of electrical energy, such as machines, transformers, apparatus, measuring instruments, protective devices, wiring systems, accessories, appliances and luminaires.
As such, the electrical installation within a building would be the collective noun used to describe all of the aforementioned items.
--ECA
[edit] Related articles on Designing Buildings
- 18th Edition Wiring Regulations.
- Articles about electricity.
- BS 7671.
- Changing lives with the Practical Participation Programme
- Consumer electronics.
- Consumer units.
- Data cables and the CPR.
- ECA articles.
- Electrical appliance.
- Electrical component.
- Electrical conduit.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrical system.
- Electrical wiring
- Electrician.
- Electricity supply.
- Glossary of electrical terms.
- Industry backs leading fire and security awards.
- Modular housing and electrical circuitry.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.