Crosswall construction
Cross-wall construction is a form of construction in which load bearing walls provide the primary vertical support and lateral stability for precast floors. External wall panels, lift cores or staircases are used to provide the required longitudinal stability. Bridging components such as floors, roofs and beams are supported by the load bearing walls or façade wall.
If both walls and floors are of cast in situ reinforced concrete, the series of ‘boxes’ so formed is sometimes referred to as ‘box frame construction’.
The system is ideal for buildings with cellular and orthogonal grids, with rooms of up to 4 x 9 m. It is suitable for buildings up to a height of five storeys where the floors are similar and where internal separating or party walls are required, such as in blocks of flats and student accommodation.
It creates a structurally efficient building with high levels of acoustic and fire separation between adjacent rooms. This is due to the high mass of the structure and good airtightness. Cross wall construction also has good thermal mass.
Cross-wall systems can offer significant time and cost savings in comparison to traditional building techniques as the components can often be prefabricated. In addition, the arrangement of windows between crosswalls is unrestricted.
The precast elements are typically brought to site 'just in time'. Hidden joints and ties, both horizontally and vertically are grouted in place as the work develops. Other works such as installation of mechanical and electrical services and finishes that are required can start prior to the completion of the entire structure.
Cross-wall construction involves a number of key connections:
- Wall-to-wall at vertical joints.
- Wall-to-wall at horizontal joints.
- Wall-to-base/foundation.
Care must be taken in both design and construction to ensure that the junctions between the non-load bearing claddings and the crosswalls are weather resistant.
If a pitched roof is to be included with the ridge parallel to the lateral axis, there will need to be an edge beam to provide a seating for the rafters and to transmit roof loads to the crosswalls.
[edit] Related articles on Designing Buildings Wiki
- Cavity wall.
- Cladding.
- Concrete frame.
- Diaphragm wall.
- Modular buildings.
- Offsite manufacturing.
- Off-site prefabrication of buildings: A guide to connection choices.
- Party wall.
- Precast flat panel system.
- Prefabricated structural panels.
- Prefabrication.
- Preventing wall collapse.
- Wall types.
[edit] External resources
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2006)
Featured articles and news
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Comments
Hi my house is of this design, I want to remove a timber and plasterboard partitionwall in my kitchen and make it bigger but am worried if it’s load bearing as it is pretty much the only interior wall downstairs of the house? Any help appreciated thanks in advance.
nick
If you're not certain, you should get a structural engineer to check it out for you. It should be relatively quick and straight forward job for them.