Procurement team for design and construction
Procurement is the purchasing process for goods and services. On a construction project, procurement may be used to purchase design services, construction works, goods, mateirals and so on.
The team that carry out this process (or part of it) may be described as a procurement team. Their functions are typically conducted via a tendering process and may involve; defining procurement packages, preparing tender documents, identifying suitable suppliers, assessing tender submissions, negotiating and agreeing terms and so on.
They will typically work for contractor or developer, and ensure the design and construction of a building is procured according to a strategy that meets both their own commercial needs and the objectives of the client. Typical considerations are likely to include speed, cost, quality, specific project constraints, risk, ownership, financing, insurance and warranties, track record, market conditions and so on.
A procurement team (which my range from a single individual to a whole department) is usually necessary as projects are complex, with many suppliers and defined timescales, and contractors may be inundated with offers from suppliers. It is the job of the procurement team to manage suppliers and develop purchasing strategies that meet the requirements of the project.
The procurement manager who may lead the procurement team will usually be responsible for developing a clear procurement strategy for the purchase of goods and services. They may be part of a wider finance team and will typically be a qualified, mid- to senior-level management individual.
The members of a procurement team will usually be professionals who are experienced in providing essential services and skills related to the purchase of materials and supplies for the building project. They may have relevant educational qualifications in business, purchasing, quantity surveying, construction management and so on, but usually, there are no specific requirements to have procurement-related qualifications. Some procurement managers and team members may simply have long and valued experience in the area. However, qualifications options are available, for example through the Chartered Institute of Procurement and Supply (CIPS).
The individuals working for a procurement manager may be organised so that each is responsible for procuring certain aspects of a construction contract e.g materials for substructure, superstructure, fit-out etc.
[edit] Related articles on Designing Buildings Wiki
- Admeasurement
- Automated vendor selection.
- Construction contract
- Construction manager
- Design and build procurement route
- Design build finance and operate
- Engineering procurement and construction contract
- Fast track construction
- Framework contract
- Guaranteed maximum price for construction contracts
- Lump sum contract
- Management contractor
- Managing the procurement process
- OJEU procurement procedures
- Private finance initiative
- Procurement plan.
- Procurement route options pros and cons
- Public private partnerships PPP
- Public procurement
- Single-stage tender
- Tender processes for construction contracts
- Traditional contract for construction
- Two-stage tender
- Typical tender process for construction projects.
[edit] External references
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..