Procurement plan
Procurement is the complete process of acquiring the right goods and services under specific conditions to satisfy a requirement. In the context of designing and constructing buildings, a procurement plan is the result of a process that involves deciding what to buy, when to buy it, how, and from whom.
On a typical building project, the items that need to be procured is very long and detailed. Not properly managing this list could mean higher costs and a longer project duration. It is the responsibility of the procurement manager to manage all procurement activities that fall under the project.
The procurement plan is an important document as it establishes the procurement framework for the project and throughout the project becomes a guide (which can be amended) for procurement management.
A procurement plan can include:
- Project requirements, the project team, timelines, etc;
- Items to be procured, their justification, requirements and the contracts and procurement routes that may be adopted;
- How costs will be determined;
- Selection criteria;
- The standard procurement documentation to be used – particularly important for large projects;
- A procurement schedule, with timelines for the steps leading to contract award and fulfilment;
- Contract deliverables and deadlines;
- Specific actions needed to start and complete purchases;
- List of procurement risks, their management and mitigation;
- Long lead time items;
- Assessments of staffing requirements;
- Purchases made;
- Comparison of how the actual procurement process compares with the procurement plan, and
- Strategies to ensure bids are fair and deliver best value for the client.
A typical procurement plan will list the items required and alongside each item will be the justification (i.e the reason it is needed e.g ‘required to attach trim to fascia’ etc) and the date it is needed by. In addition to the list of items, the procurement plan may also mention those individuals who are authorised to approve purchases on behalf of the project team.
Procurement planning is important because it:
- Establishes buying requirements, timescales and available sources;
- Enables a procurement strategy to be formulated for each item in the procurement plan;
- Determines how realistic expectations are;
- Gives stakeholders the chance to discuss procurement options;
- Allows the time required to complete the procurement process to be estimated.
- Help deliver best value for the client.
[edit] Related articles on Designing Buildings Wiki
- Admeasurement.
- Construction contract
- Construction manager
- Design and build procurement route
- Design build finance and operate
- Design, build, manage contractor.
- Engineering procurement and construction contract
- Framework contract
- Management contractor
- Managing the procurement process
- OJEU procurement procedures
- Partnering in construction
- Procurement route.
- Public private partnerships PPP
- Public procurement
- Schedule of rates for construction
- Single-stage tender
- Supply contract.
- Tender processes for construction contracts
- Traditional contract for construction
- Two-stage tender
- Typical tender process for construction projects
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.